|
1. The Subject Of The Order Is The Reconstruction Of The Internal Road Of Migdałowa Street In Ostrowiec Świętokrzyski On The Street Section: 1) Section No. 1 From Km 0+033.75 To Km 0+224.22.2) Section No. 2 From Km 0+000.00 To Km 0+098.35.3) Section No. 3 From Km 0+000.00 To Km 0+061.73.4) Section No. 4 From Km 0-045.79 To Km 0+074.20 With A Total Length Of 470.54 M From The Intersection With Zwierzyniecka Street.2. The Task Includes The Reconstruction Of An Internal Road With A Single-Space Roadway With A Width Of 4.5 M To 6.0 M, An Asphalt Concrete Surface And Concrete Paving Stones, The Construction Of: A Pedestrian Road Made Of 2.0 M Wide Concrete Cubes, A Roadside Made Of 1.0 M Wide Concrete Cubes, A Roadside Made Of Crushed Stone 0.75 M Wide, Street Lighting With Illumination Of Pedestrian Crossings, A Rainwater Drainage System, Entrances To The Property And Installation Of Vertical And Horizontal Markings, Construction And Installation Of An Information Board.3. The Subject Of The Order Includes The Reconstruction Of An Internal Road, Including: 1) Reconstruction Of A Single-Space, Two-Lane, Two-Way Road, 1/2 Wide From 4.5 M To 6.0 M, With Two Lanes With A Surface Made Of Mineral And Bituminous Mass And Concrete Paving Stones With A Substructure, 2) Construction Of A Pedestrian Road (Sidewalk) With A Surface Made Of 8 Cm Thick Concrete Cubes, 2.0 M Wide, 3) Construction Of A System Road Drainage In The Form Of A Storm Sewage Network With A Diameter Of 400 Mm, 4) Construction Of A Street Lighting Network And Illumination Of The Pedestrian Crossing, 5) Reconstruction Of Individual Exits To The Property, 6) Construction Of Vertical And Horizontal Markings. The Reconstruction Will Be Carried Out On The Basis Of The Notification Of Construction Or Execution Of Other Construction Works Of February 23, 2024, Including The Reconstruction Of The Internal Road Of Migdałowa Street In Ostrowiec Świętokrzyski Together With Certificate Of Lack Of Grounds For Objection To The Intention To Perform Construction Works, Reference Number: Ab.6743.100.2024.Sp Of March 13, 20244. The Subject Of The Order Is Specified In The Design Documentation, Including: 1) Land Development Design, 2) Technical And Executive Design For The Following Sectors: Road, Sanitary And Electrical, 3) Permanent Road Traffic Organization Design, 4) Technical Specification For The Execution And Acceptance Of Works, And: 5) Notification Of Construction Or Execution Of Other Construction Works Of February 23, 2024, Including The Reconstruction Of The Internal Road Of Migdałowa Street In Ostrowiec Świętokrzyski Together With A Certificate Of Lack Grounds For Objecting To The Intention To Perform Construction Works, Reference Number: Ab.6743.100.2024.Sp Of March 13, 2024,6) Bill Of Quantities, Which Is Only An Element Supplementing The Design Documentation,7) This Description And Technical Conditions For The Implementation Of The Subject Of The Order.5. Scope Of The Order.1) As Part Of The T
|