1. The Subject Of The Order Is The Service Entitled: Preparation Of Design Documentation For The Task Entitled Modernization Of The Topolno Pump Station. 1.1. The Subject Of The Basic Order (Hereinafter Referred To As The Basic Order Or Basic Task) Is The Service Consisting In The Development Of Comprehensive Design Documentation Along With Obtaining All Necessary Opinions, Arrangements, Permits And Administrative Decisions Enabling The Implementation Of The Task Titled: Modernization Of The Topolno Pump Station. The Technical Solutions Designed As Part Of The Order Are Aimed At Improving The Technical Condition Of The Facility And Its Modernization By: Replacing Pumping Units With New Ones, Modernizing The Automation And Control System Of The Pumping Station, Rebuilding And Increasing The Capacity Of The Expansion Tank And Constructing A Sand Trap. The Implementation Of The Basic Order Is Divided Into The Following Stages: Stage I, Stage Ii, Stage Iii, Described In The Description Of The Subject Of The Order, Constituting Annex No. 1 To Swz.1.2 The Ordering Party Provides For The Possibility Of Using The Option In This Order. The Subject Of The Contract Under The Option Right Are The Following Services: Option I: Environmental Impact Report (Eis) (If The Authority Imposes The Obligation To Prepare The Report) In Accordance With The Requirements Of Reviewing Bodies And Determining The Scope Of The Report (Paper And Electronic Versions) In The Amount Required By The Provisions Of The Act Of October 3, 2008 On The Provision Of Information On The Environment And Its Protection, Public Participation In Environmental Protection And On Environmental Impact Assessments (Consolidated Text: Journal Of Laws Of 2024, Item 1112, As Amended). Option Ii: Performing Authors Supervision Over Works Performed On The Basis Of The Developed Design Documentation As Part Of The Basic Order, Which Will Be Performed From The Date Indicated In The Notification Of The Commencement Of Construction To The Date Indicated As The Date Of Completion Of Construction In The Notification Of Completion Of Construction. Note: A) The Ordering Party Envisages The Application Of The Option Right Pursuant To Art. 441 Of The Public Procurement Law. The Condition For Triggering The Option Right Is The Ordering Partys Declaration Of Will To Perform The Order Under The Option Right, Submitted To The Contractor In Writing; B) The Ordering Party May Resign From Performing All Or Part Of The Order Covered By The Option Right; C) The Use Of The Option Right Is Not Obligatory. If The Ordering Party Does Not Exercise The Option Right, The Contractor Is Not Entitled To Any Claims In This Respect. A Detailed Description Of The Subject Of The Order And The Terms Of Execution Of The Order Are Specified In: - Description Of The Subject Of The Order (Opz) - Annex No. 1 To The Swz, - Draft Provisions Of The Contract (Ppu) - Annex No. 7 To The Swz.2. Order Completion Date: 2.1. Deadline For Completion Of
Contact Information
Address
Państwowe Gospodarstwo Wodne Wody Polskie,Warszawa,00-613,Mazowieckie,Pl911 - Miasto Warszawa
Contact No.
+48583261888
Email
zamowienia-gd@wody.gov.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111088905
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.