Tenders Are Invited For Rehabilitation Of The Municipal Road Bgs 2214 /From The Junction Of The Village Of Z ... in Bulgaria
Tender Notice
TenderID
111080591
Tender Brief
Tenders Are Invited For Rehabilitation Of The Municipal Road Bgs 2214 /From The Junction Of The Village Of Zidarovo - The Village Of Gaber - The Village Of Varshilo On The Road Bgs 1213/- The Village Of Gaber, Municipality. Sozopol
The Current Public Procurement Provides For The Rehabilitation Of Municipal Road Bgs 2214 /From The Junction Of The Village Of Zidarovo - The Village Of Gaber - The Village Of Varshilo On The Road Bgs 1213/- The Village Of Gaber, Municipality. Sozopol. The Contractor Is Expected To Carry Out The Planned Activities Qualitatively, As Well As To Remove Defects, If Any, In Accordance With The Warranty Terms. The Purpose Of The Project Is The Rehabilitation Of The Municipal Road Bgs 2214 / From The Junction Of The Village Of Zidarovo - The Village Of Gaber - The Village Of Varshilo On The Road Bgs 1213 / - The Village Of Gaber, Municipality. Sozopol From Km 0+000.00 To Km 3+174.00 The Project Aims To: Restored The Road Surface - The Operational Qualities And The Carrying Capacity. To Improve Drainage Through Optimality. Provide Appropriate Restraint Systems. To Provide For New Horizontal And Vertical Signaling. The Beginning Of The Site Is At Km 0+000 At The Intersection The End Of The Site Is At Km 3+174 In The Village Of Gabar Situational Solution And Project Dimensions The Route Was Developed Under The Following Conditions: - Design Speed: 40Km/H (For Open Road From Km 0+000 To Km 2+620) - Design Speed: 30 Km/H (For Settlements From Km 2+620 To Km 3+174 - Length Of The Route 3 174.00M (According To Geodetic Measurement) - Situation: The Situational Solution Is Constructed With Straight, Horizontal And Transition Curves. In The Settlements, The Existing Situation Is Respected As Much As Possible, Given The Cadastral Plan, Etc. Construction. In An Open Road, The Situation Is Developed As Much As Possible According To The Design Speed. In Places Where Also Elements Are Smaller Than Those Provided For In The Regulation No. Rd-02-20-2 For The Design Of Roads From August 28, 2018 (According To Art. 31, Para. 1, Horizontal Circular Curves Are Designed With Radii Not Smaller Than Min Rkr=30M / At Design Speed Vpr= 30 Km/H/, And According To Art. 32, Para. 3, The Parameter Of The Transition Curve A Is Chosen Within The Limits Of 1/3 Rkr To Rkr)
Contact Information
Contact Person
Ралица Йорданова Василева
Contact No.
+359055025775
Email
rdyankova@sozopol.bg
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111080591
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.