|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af032022ps, Regularization And Compaction Of Predominantly Sandy Soil Subgrade, For Pavement Construction Works. Af092024, Construction Of Base And Sub-Base For Paving Soil With Sandy Laterite Behavior, 15 Cm Thick - Exclusive Of Excavation, Loading And Transport And Soil. Af092024, Loading, Maneuvering And Unloading Soil And Granular Materials In A 6 M³ Dump Truck - Loading With Bucket Loader From 1.7 To 2.8 M³ 128 Hp And Free Unloading Unit: M3. Af072020, Transport With 10 M³ Dump Truck, On Urban Road In Natural Bed Unit: M3xkm. Af072020, 03/27/2026 - 15:47:05, 03/27/2026 - 16:27:18, 03/27/2026 - 16:27:19, 03/27/2026 - 16:27:22, Execution Of Flooring On Interlocking Floor, With Hexagonal Block 25 X 25 Cm, Thickness 8 Cm. Af102022, Laying Of Curb Guide In Straight Section, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm Length X Lower Base X Upper Base X Height. Af012024, Conjoined Concrete Curb And Gutter Guide, Molded In Place Into A Curved Section With Extruder, 45 Cm Base 15 Cm Guide Base + 30 Cm Gutter Base X 22 Cm Height. Af012024, Accessibility Ramp Made Of Concrete Cast In Place, On A New Sidewalk With A Width Greater Than Or Equal To 3.00 M, Fck 25Mpa, With Podotactile Floor. Af03202, Execution Of Sidewalk Or Concrete Floor With Cast-In-Place Concrete, Made On Site, Conventional Finish, Not Reinforced. Af082022, Enamelled Steel Plate For Street Identification, 045 Cm Painting A Pedestrian Crossing Or Zebrada Retroreflective Paint Based On Acrylic Resin With Glass Microspheres, And 30 Cm, Manual Application. Af052021, Molded In Place In Straight Section With Extruder
|