|
Construction Work – New Construction Of Eschershausen High School In Modular Construction - Total Contractor Services For Buildings And Open Spaces. In Order To Take The Development Of The School Landscape Into Account, The Holzminden District Is Planning To Build A New Eschershausen Secondary School. The Bodenwerder High School, The Stadtoldendorf High School And The Eschershausen Secondary School Are To Be Merged Here. . The Office Sehw Architektur Gmbh, Berlin, Was Commissioned With Service Phases 1 And 2. The Present Preliminary Design Plan Was Created On The Basis Of The Approved Spatial Program, Which Was Coordinated With The School, And In Coordination With The Developer, The Holzminden District. . The Aims Of The Design Are: - A Building That Creates Identity And Is Adapted To The Location - Respectful And Sensitive Interaction With The Neighborhood Despite The Large Construction Volume - Creating A New School Location With Infrastructure, Transport Connections, Parking Facilities, Bus Stops, Etc. - Creating A Contemporary, High-Quality And Flexible Learning Environment - Architecture As A Support For Educational Concepts - Sensible And High-Quality Design Dealing With The Demanding And Impressive Topography Of The Location - Compliance With Building Regulations. - Achieving Maximum Possible Sustainability And Energy Efficiency. The Property Intended For The New Building Is Located South Of The Existing Eschershausen Sports Hall, Embedded Between An Established Residential Area In The West And The Mineral Water Outdoor Swimming Pool In The East. What Is Characteristic Of The Construction Site Is Its Strong Topographical Characteristics: With A Height Difference Of Around 18 Meters, The Site Slopes Noticeably From Southwest To Northeast. This Special Location Creates A Central Design Challenge - Dealing With The Slope Sensitively And At The Same Time Functionally. . The School Building To Be Realized Has A Gross Floor Area Of Approx. 12,902 M2. The Client Intends To Build The New Eschershausen High School Using Modular Construction. The Contractor Should Take Over All Planning And Construction Services For The Realization Of The Project For Buildings And Open Spaces. . The Construction Work For The Kg300 And Kg400 Must Be Provided And Completed On A Turnkey Basis From The Defined Interface, I.E. Complete, Functional, Equipped, Ready For Operation, In Accordance With The Flb And The Contractors Plans. This Refers To The Deliveries And Services, Including All Preparatory, Ancillary And Follow-Up Work For The Complete Provision Of The Construction Services. This Includes: Construction Site Setup, Sampling In Coordination With The Client, Keeping A Plus-Minus List, Health And Safety Regulations, Pvo/Inspection Experts. The Project Management, Project Communication And Responsible Construction Management Required For The Service Are Part Of The Tu Service. This Includes Contractor-Specific Project Management, As Well As Proper Organizational, Qualitative And Scheduling Control, Especially Of The Subcontractors Used. The Consideration Of Vob/B, Vob/C, Bgb As Well As Recognized Technical Rules (En And Din Standards, Vde, Vdi, Vds And Tüv Regulations)
|