Railway Construction Works – Vb Bauleistungen Ge/We Bf. Haynsburg (Str. 6383, Km 49,900 - 51,000). At Haynsburg Station, The Superstructure And The Entry Switches Are Being Renewed. The Remaining Platforms And Two Protective Switches Will Be Dismantled. In Addition, The Entire Station Needs To Be Retrofitted With Track Vacancy Detection Technology. A New Ewh Has To Be Built In The 50 Hz Trade And Various Dismantling Work Has To Be Carried Out. Key Areas Of Service: Dismantling Eq. 4 - Existing: 110 M K49 - H - 1667 - Track Dismantling In Individual Materials, Conventional With Two-Way Technology Dismantling/Gap Closure Switch 2, Rb Buffer Stop - Existing: Abw 49 - 190 - 1: 9 R (H) - New: W14k - 49 - B70-2.4 - 1538 - Switch Dismantling Conventional With Two-Way Technology - Complete Bedding Renewal (Vbe) Conventional Dismantling/Gap Closure Switch 4 - Existing: Abw 49 – 300 – 1: 9 R (H) - New: W14k – 49 – B70-2.4 – 1538 - Switch Dismantling Conventional With Two-Way Technology - Complete Bedding Renewal (Vbe) Conventional Dismantling/Gap Closure Switch 5 - Existing: Abw 49 - 190 - 1: 9 - L (H ) - New: W14k - 49 - B70-2.4 - 1538/ W14k - 49 - B70 - 1538 - Switch Dismantling Conventional With Two-Way Technology - Complete Ballast Renewal (Vbe) Conventional Track Renewal Track 1 Track Renewal (Conventional): Km 49,975 - Km 50,911,936 M Including Complete Track Renewal (Conventional) Track Renewal Track 2 Track Replacement (Conventional): Km 49,975 - Km 50,911,936 M Including Complete Track Replacement (Conventional). Switch Renewal Switch 1 - Existing: Ibw 49 - 500 - 1: 12 L (H) - New: Ibw 54 - 500 - 1: 12 L (B) - Switch Dismantling Conventional With Two-Way Technology - Complete Bedding Renewal (Vbe) Conventional - Switch Installation With Switch Construction Crane Switch Renewal Switch 6 - Existing: Abw 49 - 500 - 1: 12 L (H) - New: Abw 54 - 500 - 1: 12 L (B) - Switch Dismantling Conventionally With Two-Way Technology - Complete Ballast Renewal (Vbe) Conventional - Switch Installation With Switch Construction Crane Renewal Of The Level Crossing Surface Km 50,579 - Renewal Of The Level Crossing Surface - Renewal Of Asphalt On The Road On The Left And Right As Well As Between The Tracks - Renewal Of The Cross Channel Cable Civil Engineering Work Approx. 855 M New Construction Cable Trough Size. Ii I.F. - Concrete Edge Path Construction Approx. 255 M New Construction Of Edge Path Construction Approx. 2,170 M Restoration Of Edge Paths Provision Of Ballast And Mechanical Rail Processing Gravel Approx. 6,445 T 50 Hz Work Replacement Construction Of The Electric Switch Heating 1 And 6, Dismantling And Disposal Of Old Systems Lst Work Dismantling And Disposal Of Existing Axle Counting Signaling System, Construction Of A New Track Vacancy Signaling System And Adaptation To Existing Stw, Adaptation Of Pzb And Cable Route/System, Dismantling Of Signal Boards, Security And Construction-Related Services (Under Total Closure)
Contact Information
Address
Adam-Riese-Straße 11-13
Contact No.
+49 34123424812
Email
Anke.Schlobach-Dietze@deutschebahn.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111070207
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.