Architectural And Related Services – Energy-Saving Renovation Of The Mehlingen Multi-Purpose Hall. Description Of The Planning Task And The Construction Measure: Note: The Lph 1 According To Hoai Was Completely Carried Out By The Architects Matthias Reh From Kaiserslautern. Lph 2 + 3 Are Pro Rata And Lph 5 - 8 Are To Be Completed And Rewarded In Full. The Basis Is The Fee Zone Iii, Minimum Rate According To Hoai 2021 § 33 Ff. History The Multi-Purpose Hall Of The Local Community Of Mehlingen Was Built In The 70S. It Is A Central Contact Point For Village Life In The Community For Young And Old. With The Help Of Funding, The Local Community Would Like To Carry Out A Comprehensive Energy-Related Renovation Of The Building And Thus Contribute To Saving Energy And Achieving The Countrys Climate Policy Goals. An Investigation Of The Hall With Regard To Fire Protection By The Specialist Office Infra-Touch, Bernd Stiegler, Neulußheim Revealed That, Among Other Things - The Heating System Would Have To Be Separated From The Neighboring Ventilation System In Terms Of Fire Protection, Which Would Mean A Lot Of Construction Effort (Installation Of Fireproof Walls, Fire Dampers, Pipe Partitions, Etc.) - Roof Insulation Materials Would Have To Be Removed From The Roof Space Due To Their Fire Behavior. In Order To Ensure Future Fire Protection And Improved Energy Standards As Well As The Need For Renovation Of Various Components, The Following Structural Measures Were Planned: 1.0 Energy Improvement Of The Building Envelopes (For Individual Measures See Appendix Project Description) 1.1 Sports Floor Construction (For Individual Measures See Appendix Project Description) 2.1 Renewal Of The Heating System (Individual Measures See Appendix Project Description) 2.2 Waste Water, Water, Sanitary Rooms And Renewal Of Hot Water Preparation (For Individual Measures See Appendix Project Description) 2.3 Renewal Of The Ventilation System (See Project Description Appendix For Individual Measures) Savings Potential: Based On The Funding Providers Specifications, The Measure Must Achieve A Final Heat Energy Saving Of Around 97%, ~654,080 Kwh. The Savings In Primary Energy Requirements Are Around 95%, ~748,000 Kwh. Against This Background, The Measures That Were The Subject Of The Calculations Underlying The Funding Application Must Be Implemented In Principle. Current Project Status: Service Phase 1 For Ojp And Tga H,L,S Has Been Completed. The Vgv Process Is Used To Find Suitable Planning Offices That Meet The Above Requirements. Plan And Carry Out Services. The Assignment Will Be Carried Out In Stages. First Of All, The Lph 2 + 3 (Proportional For Ojp), Lph 1 - 3 (Tga E) And Lph 2 - 3 (Tga Hls). There Is No Entitlement To Further Assignment. The Existing Basic Investigation And Preliminary Planning Must Be Built Upon. The Planning Is Expected To Be Commissioned From Around The End Of July / Beginning Of August 2026 (After This Process Has Been Completed). Planning Begins: Immediately After The Commissioning. A Construction Schedule Must Be Drawn Up By The End Of September 2026, In Which The Construction Process For All Trades Is Scheduled. At Least With The Preparatory Measures Like That
Contact Information
Address
Hauptstraße 86
Contact No.
+49 61314819600
Email
info@hs-psbm.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111070182
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.