Railway Construction Works – Renaturation - Connection Of 3 Oxbow Lakes To The Kinzig In Gelnhausen. As Part Of The Fulda – Frankfurt (M) Expansion Line Project, Plan Approval Section 5.16, The Implementation Of The Compensation Measures M5-New, M6-New And M7-New Is Necessary. These Include The Reconnection Of Three Backwater Areas On The Kinzig South Of Gründau-Rothenbergen. The Execution Of These Three Measures Includes Excavation Of Existing Earth Dams (Approx. 3500 M³ In Total) And Piping, Removal Of The Resulting Excavated Earth/Demolition Material, Modeling In The Terrain And Bank Area (500 M³ Excavated Earth), Introduction Of Flow Guides And Planting Of Trees. In Addition, Two Piped Culverts And An Unpaved Path As Well As The Installation Of Access Roads And Driveways Are To Be Constructed. The Felling Has Already Been Carried Out, Rootstocks Still Have To Be Removed.
Contact Information
Address
Adam-Riese-Straße 11-13
Contact No.
+49 71120927136
Email
chris.Gruenow@deutschebahn.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111069936
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.