|
Works Related To Water-Distribution Pipelines - Preparation Of A Technical Project, Implementation Of Authors Supervision And Implementation Of Site Construction: Reconstruction Of A Water Supply Network For The Village Of Aprilovo, Municipality Of Galabovo - Stage-1. The Object Of This Public Procurement Is Construction - (Design And Implementation Of Construction) In The Sense Of Article 3, Paragraph 1, Item 1, Letter B Of The Public Procurement Act With The Subject Preparation Of A Technical Project, Implementation Of Authors Supervision And Implementation Of Construction Of A Site: Reconstruction Of A Water Supply Network For The Village Of Aprilovo, Municipality Of Galabovo - Stage-1, Construction Is The Fourth Group, Second Category And With The Following Scope: According To Staging Map (Branch #1 With Start Point: 40, Intermediate Point/S: 39, 38, 37, 36, 33 And End Point: 31; Branch #2 With Start Point: 2, Intermediate Point/S: 3, 4, 7 And End Point: 8; Branch #3 With Start Point: 41, Intermediate Point/S: 48, 44, 47, 51, And End Point: Branch #4 With Start Point: 34, 32 And End Point: Branch #5 With Start Point: - And End Point: 59, Intermediate Point/S: 83 Branch #7 With Starting Point/S: 41 Branch #8 With Starting Point/S: 38, 2 And Ending Point Branch #9 With Starting Point/S: 48, 37, 3 3; Branch #10 With Start Point/S: 35, 36 And End Point: Branch #11 With Start Point/S: 95, 99, 100, 54, 33, 7 And End Point: 7 83, Intermediate Point/S: 83, 58, 57, 32, 31, 8 And End Point: 8; Branch No. 13 With Starting Point: 59, Intermediate Point/S: - And End Point: 30) For Reconstruction And New Construction Of The Water Supply Network With A Total Length Of L= 5,200M Of Water Supply Network, Including Reconstruction And Connection Of Building Water Supply Diversions (Svo), As Well As The Construction Of Fire Hydrants At A Standard Distance, Providing For The Installation Of A Sufficient Number Of Sc, Ph, Air Handlers And Dischargers Along The Routes. The Scope Will Be Implemented Within The Framework Of Main Activities #2, #10 And #12 And Their Accompanying Main Activities In The Respective Stages, As Follows: All Main Activities #1, From #3 To #9, #11 And From #13 To #29 Inclusive, As Necessary Activities And All Necessary Costs For Their Implementation, Will Be Provided In The Unit Prices Of Activities #2, #10 And #12 From The List Of Items Reflected In The Price Proposal. The Implementation Is Divided Into Three Main Stages, Namely: First Stage - Design With The Scope Of Main Activities From #1 To #9 Inclusive Until The Issuance Of A Construction Permit; Second Stage - Construction With The Scope Of Main Activity #10 To #25 Inclusive Until The Site Is Put Into Operation And Third Stage - Warranty Maintenance With The Scope Of Main Activity #26 To #29 Inclusive Until The Expiration Of The Longest Minimum Warranty Period Of All Minimum Warranty Periods Of Completed Construction And Assembly Works, Facilities And Construction Sites.
|