The Subject Of The Order Is The Implementation Of A Road Investment Entitled: Construction Of The Municipal Road Ul. Wakacyjna (Km From 0+035.00 To 1+754.69) In Tarnobrzeg. And Obtaining The Required Decisions Authorizing The Use Of The Road, In Accordance With The Procedure Specified In The Construction Law, In The Scope Of: • Road Industry: - Demolition Works Of The Existing Road Structure And Cutting Down Of Trees And Bushes Interfering With The Implementation Of The Investment, - Construction Of A Single-Lane Road With A Bitumen Surface 5.5 M Wide, Curbed On Both Sides, With A Length Of Approx. 1+720 Km, - Construction Of Intersections (Reconstruction Of The Intersection Of Wakacyjna Street With Ocicka Street At Km 1+234.60), - Construction Of Regular Exits With A Bituminous Surface And A Surface Made Of Colored Concrete Cubes, - Construction Of A 2.0 M Wide Pedestrian Road With A Surface Made Of Colored Concrete Cubes Framed On Both Sides With A Concrete Edge, - Construction Of A Two-Way Bicycle Road 2.5 M Wide On A Bituminous Surface Framed On Both Sides With A Concrete Edge, (Pedestrian Road And Bicycle Path Separated By A Green Belt) - Construction Of Two Bus Bays With Bituminous Surface, - Implementation Of New Traffic Organization, Including Road Traffic Safety Devices, New Vertical Markings And Thick-Layer Horizontal Markings, - Construction Of Small Architecture Elements: Bus Shelters, Bicycle Shelters, Waste Bins, Benches, • Electrical And Telecommunications Industry: - Collision Removal, - Construction Of Street Lighting, - Construction Of Pedestrian Crossing Lighting, - Construction Of A Technological Channel, • Industry Sanitary: - Removal Of Conflicts, - Reconstruction And Protection Of The Gas Network, - Reconstruction Of Sections Of The Water Supply Network, - Construction Of A Storm Sewage System (Construction Of A Storm Sewage System With Inspection Wells And Storm Inlets With Drains With Drainage To The Existing Storm Sewage System In Żeglarska Street And Construction Of A Storm Sewage System With Inspection Wells And Rain Inlets With Drains With Drainage To The Designed Retention Reservoir), - Construction Of A Reservoir Retention Pond With A Fence, • Other Works Resulting From The Adopted Design Solutions, Obtained Technical Conditions, Opinions And Formal And Legal Decisions. With Attachments 1) - Design Documentation. The Entire Investment Project Should Be Implemented In The Following Order For The Main Elements Of The Works: • Preparatory Works: Including: Removal Of Existing Greenery (Cutting Down Trees And Bushes), • Reconstruction Of All Colliding Elements Of Technical Infrastructure, • Earthworks: Excavations And Embankments For The Main Road, Access Roads To Facilities, Pedestrian And Bicycle Paths, Etc., • Construction Of A Rainwater Drainage System And Other Drainage Elements (Including A Retention Reservoir - Open, Tight), • Surface Works On The Main Road, Pedestrian And Bicycle Paths, Exits, Etc., • Constructi
|