1. The Subject Of The Order Is: The Design, Construction And Obtaining A Final Decision Regarding The Permit To Use The Orlik Sports Complex In Wawrzeńczyce, Igołomia-Wawrzeńczyce Commune (Task 2). In The Design And Build Formula, In Technology Consistent With The Requirements Of The Investment Program Called Program For The Construction Of Sports Complexes Orlik 2025.2. The Task Consists Of The Design And Construction Of A Sports Complex In Accordance With The Following:2.1. In The Scope Of Preparation Of Design Works:2.1.1. Obtaining An Excerpt And Outline From The Local Development Plan,2.1.2. Obtaining A Current Situation And Height Map For Design Purposes, 2.1.3. Carrying Out Geotechnical Tests Of The Subsoil And, If Necessary, Preparing And Approving The Design Of Geological Works And Geological And Engineering Documentation, If Necessary),2.1.4. Making An Inventory Of Existing Greenery And A Plan For Necessary Cuttings That Conflict With The Intended Investment, As Well As Obtaining Consent For Cuttings, 2.1.5. Obtaining Technical Conditions For The Supply Of Utilities And Wastewater Collection (Including, Above All, Connection Conditions For Electricity Supply, Water Supply, Collection Of Sanitary Sewage And Rainwater And Meltwater), 2.1.6. Obtaining A Decision On The Location Of The Exit Or Exits To The Plot Constituting The Investment Area And A Permit For The Exit, 2.1.7. Obtaining Any Other Necessary Studies, To The Extent Enabling The Development Of Design Documentation And Obtaining A Decision On The Construction Permit For The Planned Investment. 2.2. In The Scope Of Implementation Of Design Works: Development Of Full, Multi-Discipline Design Documentation To The Extent Described In The Fup Necessary For The Implementation Of The Investment, Which Will Include: 2.2.1. Multi-Discipline Conceptual Design,2.2.2. Multi-Discipline Construction Design With The Necessary Arrangements (Land Or Plot Development Design, Architectural And Construction Design, Technical Designs, Construction Design Attachments), 2.2.3. Executive Designs Along With The Necessary Arrangements, 2.2.4. Work Takeoffs,2.2.5. Cost Estimates, 2.2.6. Technical Specifications For The Execution And Acceptance Of Construction Works, 2.2.7. Obtaining Possible Consents To Enter Land Belonging To Third Parties, 2.2.8. If Necessary, Obtaining A Decision From The Competent Conservator Of Monuments Specifying The Detailed Scope And Type Of Necessary Archaeological Research, 2.2.9. Preparation Of An Application For A Building Permit Or An Application For Reporting Construction Works That Do Not Require A Building Permit, 2.2.10. Obtaining Any Additional Consents, Decisions, Permits, Technical Conditions, Other Materials - If It Becomes Necessary During The Preparation Of Documentation Or Implementation Of The Investment, 2.2.11. Transfer Of Copyrights To The Design Documentation To The Ordering Party Under The Terms Specified In The Contract.2.3. In Terms Of Execution:2.3.1. Spo
|