|
4.1. The Subject Of The Order Are Construction Works On The Investment Task Entitled: Construction Of Municipal Road No. 105132L In The Town Of Kijany, Spiczyn Commune.4.2. The Subject Of The Order Includes The Construction Of Municipal Road No. 105132L In The Town Of Kijany, Commune. Spiczyn And Consists Of Three Tasks: 4.2.1 - Task 1 - Construction Of Municipal Road No. 105132L In The Town Of Kijany, Class D, On A Section Of 561.30 M As A Single-Road, Single-Lane, Two-Way Road With A Width Of 3.5 - 5.0 M, In Accordance With The Design Documentation, Including: - Construction Of An Earth Bed, - Construction Of A New Foundation Made Of Concrete Rubble 0/63 Mm With A Thickness Of 25 Cm And Recycling Using Cement, - Developing A Recipe To Produce A Mixture With A Strength Of 2.5 Mpa, - Making A Leveling Layer Of Crushed Aggregate 0-31.5 Mm, - Making A New Road Surface Of Asphalt Concrete With A Width Of 3.50-5.00 M, - Making A Binding Layer, - Making Roadsides From Mineral Aggregate 0-31.5 With A Width 0.75 M, - Reconstruction Of Existing Exits, - Preparation Of An As-Built Geodetic Inventory, - Execution Of Vertical And Horizontal Markings, - Cutting Down Trees And Bushes Colliding With The Designed Infrastructure, - Protection Of Colliding 0.4Kv Low-Voltage Cables With The Planned Construction Of Municipal Road No. 105132L In Accordance With The Agreement To Remove The Conflict Concluded With Pge Dystrybucja Spółka Akcyjna With Its Registered Office In Lublin And Representing The Ordering Party Before Pge Dystrybucja S.A. In The Scope Of The Implementation Of This Contract, In Particular In Matters Of Technical And Organizational Arrangements, Acceptance Of Works, Correspondence And All Activities Necessary For The Proper Performance Of The Obligations Arising From This Contract. - Obtaining, On Behalf Of The Ordering Party, A Valid Occupancy Permit Or A Certificate Of Lack Of Grounds For Objection To The Notification Of The Construction Supervision Authority About The Completion Of Construction. Note: Task 1 Should Be Performed In Accordance With The Existing Design Documentation. The Fup Does Not Constitute The Basis For The Implementation Of This Task. Detailed Description Of The Subject Of The Order: A Detailed Description Of The Subject Of The Order For Task 1 Is Included In Annex No. 1.1 To The Swz. It Consists Of The Following Documents: 1) Design Documentation, Including: Architectural And Construction Design, Land Development Design, Technical Design, Permanent Traffic Organization, Zrid Decision, 2) Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb), With The Proviso That In A Situation Where The Provisions Of The Contract Specify The Method Of Carrying Out The Works Or Acceptance Or Settlement Of Works In A Manner Different From The Stwiorb, The Provisions Of The Contract Are Binding, 3) Executive Design For The Protection Of Colliding Lv Cables 0.4Kv With The Planned Construction Of Municipal Roa
|