|
Part 1 – Długa 37A1. In The Scope Of General Construction Works: - Replacement Of Loose Plasters, - Replacement Of Interior Doors To The Attic And Storage Rooms, - Scraping And Washing Off Old Paints On The Surface Of Walls, Ceilings And Wooden Elements, - Removing Old Carpets From The Floor, - Construction Of Grids For Gypsum Board Cladding With Wooden Strips - Ceilings, Stair Flights + Attic And Storage Compartments, - Gluing The Mesh Strengthening On Walls And Ceilings, - Applying Putty On Ceilings, - Applying Thick Textured Plaster On Walls. Max 1.5 Mm Colored In The Mass Along With Varnishing The Surface In The Paneling Section, - Painting Ceilings With Emulsion Paints, - Painting Balustrades, Risers, Plinths, Window Sills, Pipes With Oil Paint, Along With Surface Cleaning And Filling, - Filling In The Missing Balustrade Balusters While Maintaining The Original Shape, - Nailing Osb Boards To The Floors And Steps, - Installing A Plastic Lining On The Floor, - Installing Finishing Elements - Quarter Rounds And Aluminum Corner Strips Of Steps, - Removal And Disposal Of Debris;2. In The Scope Of Electrical Works: - Replacement Of The Lighting Installation With Led Fixtures With Motion Sensors In Common Areas (Staircase, Attic, Basements), - Replacement Of Installations Supplying Residential Premises With 3-Phase Ydyp 5X4 Mm2 Cables, - Replacement Of Metering Cabinets With 3-Phase Ones With Pre-Meter Protections, - Replacement Of The Wlz Riser With Lgy 5X25 Mm2 Cable And Multi-Story Boxes Wlz, - Replacement Of The Installation In The Attic (Common Circuit With The Staircase - Cables Laid In Pipes), - Piercings, Punctures And Grooves Along With Surface Repairs, - Measurements Of Zeroing Effectiveness And Insulation Resistance, - Implementation Of Intercom Installation - 11 Residential Premises - Supply Of Twisted Pair Cables Or Telecommunications Cable To Each Premises And Terminate With A Flush-Mounted Junction Box.3. A Detailed Description Of The Subject Of The Order Is Included In The Technical Specification For The Execution And Acceptance Of Works, And, Additionally, In The Bill Of Quantities, Constituting Annexes To The Swz.
|