|
1. The Subject Of The Order Is The Renovation Of Walls And Ceilings In The Workshops And Sanitary Facilities In Segment B And In The Corridors In Segments A, B And The Gap Between Buildings A And C In The Vocational Education Center In Jaworzno, Ul. Promienna 66. The Scope Of The Renovation Includes: - Walls, Ceilings - Studio 10B, 11B, Sanitary Facility For Boys, Locker Room For Girls - Room. 114, Corridor In Segment A, B And The Batten Between Building A And C, - Door Joinery - Corridor Of Batten A-C, Vestibule Of The Corridor Of The Segment. A, Corridor Section. A- Electrics – Corridor Section. A, Studio 10B With Facilities. Painting Walls And Ceilings: Scraping And Washing Off Old Paint On Walls And Ceilings, Erasing Efflorescence, Repairing Cracks In Plasters, Wiping Plasters On Walls And Ceilings, Priming Wall And Ceiling Surfaces, Painting Walls And Ceilings Twice With Emulsion Paints, Painting Walls And Plinth Strips Twice With Oil Paints, Carving Out And Installing Grids Ventilation, Securing Floors And Windows With Foil, Painting Radiators With Oil Paint. Floors: Supplementing The Pvc Floor Covering In The Place Where The Door Was Replaced, Supplementing The Tiles After Forging The Steel Door Frame. Construction Works: Leaching Oil Paint On Window Sills, Painting Window Sills, Completing The Plinth With Tiles, Protecting Installations On Walls And Ceilings Against Work, Building With Plasterboard On A Grid With Mineral Wool Insulation, Priming And Replenishing Plasters, Painting Expansion Joint Casing, Dismantling And Installing Boards, Showcases, Strips And Hangers. Door Joinery: Forging Steel Door Frames From The Wall, Forging Unevenness, Disassembly Of Door Leaves, Installation Of Door Frames With Sealing With Polyurethane Foam, Installation Of Panel And Steel Door Leaves With Adjustment, Painting Door Joinery And Door Frames With Oil Paint, Replacing The Handle And Lock On Internal Doors, Taking Out And Carrying In Furniture, Removing And Disposing Of Rubble. Masonry Works: Removing Plasters Of External And Internal Door Frames, Chipping Out Frays In Walls, Cutting Out A Space In The Floor For The Wall, Filling The Walls With Aerated Concrete Blocks, Filling The Plasters, Internal And External Plasters, Removal And Disposal Of Rubble. Installation Works - Electrical: Disconnection Of Wires With A Core Cross-Section Of Up To 2.5 Mm2, Disassembly Of Lighting Fixtures, Replacement Of Installation Boxes, Replacement Of Lighting Fixtures, Installation Of Surface-Mounted Sockets With Shutters, Checking The Condition Of Insulation With An Inductor, Measurement Of Lighting Intensity. In Accordance With:1. Technical Specification For The Execution And Acceptance Of Construction Works Regarding Renovation Of Walls, Ceilings In Workshops And Sanitary Facilities In Segment B And In The Corridors In Segments A, B And The Gap Between Buildings A And C In The Vocational Education Center In Jaworzno, Ul. Promienna 66 Constituting Annex No. 1 To Swz
|