The Subject Of The Order Entitled: Project Of Błękitna Street In Bronowo (Project) Includes The Development Of Design Documentation For The Construction Of The Municipal Road Ul. Błękitna In Bronów With Drainage Via A Roadside Ditch - Single-Lane, Two-Way Road With The So-Called Passing Roads, Ensuring Mutual Visibility - 3.5 M Wide Road. Reconstruction Of Conflicting Technical Infrastructure, Reconstruction/Expansion Of Street Lighting. A Dead-End Road With A Square For Turning Around Municipal Service Vehicles, Emergency Services And Fire Brigade Combat Vehicles. Obtaining A Decision On The Permit For The Implementation Of A Road Investment (Zrid). The Road Runs Through A Plot Owned By The Czechowice-Dziedzice Commune: 1213/2 And Plots Resulting From The Approved Division Based On The Final Zrid Decision. Technical Data Of The Designed Road: - Traffic Load Category Kr1; - Single-Lane, Two-Way Road With The So-Called Passing Roads With A Hardened Shoulder With A Road Width Of 3.5 M, - Road Length: Approximately 330 M (From The Intersection With The District Road No. 4439S, Ul. Ks Jana Kunza - Blind Road), - Expansion Of The Road Lane In A Track Similar To The Existing Course Of Ul. Błękitna, - Hardened Shoulder On Both Sides. Design Documentation Includes: 1. Geodetic Documentation (Map For Design Purposes, Prepared In Accordance With Applicable Regulations, Real Estate Division Designs);2. Geotechnical Documentation;3. Construction Design For The Road Industry With Road Drainage, Including: A) Land Development Design B) Architectural And Construction Design C) Technical Design4. Rainwater Collector Reconstruction Project;5. Project For The Reconstruction Of Conflicting Technical Infrastructure;6. Street Lighting Reconstruction And Expansion Project;7. Temporary Traffic Organization Design For The Duration Of The Works;8. Permanent Traffic Organization Design;9. Technical Specifications For The Execution And Acceptance Of Construction Works;10. Bill Of Quantities;11. Investor Cost Estimate12. Obtaining A Decision Authorizing The Implementation Of A Road Investment.13. Conducting Authors Supervision (All Industries) During The Implementation Of Construction Works, Performed On The Basis Of The Design Documentation Developed By The Contractor, I.E. A) Confirming In The Course Of Performing Construction Works The Compliance Of The Implementation With The Design Documentation, B) Introducing, After Prior Consultation With The Ordering Party, The Necessary Alternative Solutions In Relation To The Structures And Materials Provided For In The Documentation, C) Supervising The Preparation Of As-Built Documentation By The Construction Works Contractor And Introducing All Changes That Occurred During The Implementation Of The Works Into The Documentation - Confirmed By Signature, D) Participation In Committees And Technical Meetings And Participation In The Acceptance Of The Investment Carried Out On The Basis Of Documentation. Material Scope Of The Subje
Contact Information
Address
Gmina Czechowice-Dziedzice,Czechowice-Dziedzice,43-502,Śląskie,Pl225 - Bielski
Contact No.
322147114
Email
zp@um.czechowice-dziedzice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111036262
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.