|
1. The Subject Of The Order Is To Provide Investor Supervision Over The Execution Of Construction Works Related To The Revitalization Of The Park. A. Mickiewicza In Ostrów Wielkopolski With An Area Of 12,114.71 M2, In The Scope Of Works In The Following Sectors: • Construction (Including Construction Of Small Architectural Objects In A Public Place: A Pier, Gazebo, Seats, Benches, Garbage Bins; Hardening Of The Area With A Mineral Surface And Clinker Pavement; Construction Of Field Stairs), • Hydrotechnical (Renovation Of The Pond) • Sanitary (Replacement Of The Rainwater Drainage System Enabling Water To Be Drained From The Pond, Together With The Replacement Of The Chamber Water Meter; Construction Of A Water Supply Connection And An Irrigation System), • Electricity (Expansion Of The External Lighting Installation), • Greenery (Cleaning Up The Existing Greenery; Developing The Area With Greenery By Planting New Trees, Shrubs, Vines, Perennials And Bulbs). The Scope Of Construction Works Will Include, Among Others: • Works This Year. Hydrotechnical Including Renovation Of An Existing Water Reservoir (Pond) With An Area Of 3,350 M2, Including: - Pumping Water From The Pond Along With Catching Fish And Transferring Fish To Other Water Reservoirs - Construction Of A Temporary Drainage Installation At The Bottom Of The Pond - Cleaning, Repair Of Pond Defects And Mowing Of Slopes - Surveying Works, - Removal Of Concrete Reinforcements Of Slopes And Dismantling Of The Concrete Bottom, - Profiling Of The Pond Bottom And Slope - Construction Of A Clay Apron - Reconstruction Of Biological And Stone Fortifications On The Pond Slopes - Reconstruction Works: Pond Slopes And Islands, Exit To The Technological Road, Sewage Inlet, - Installation Of An Aerating Fountain - Maintenance Of The Reservoir Bowl - Transfer Of Fish To The Pond - Finishing And Cleaning Works - Works This Year. Construction Including: - Construction Of New Paths From Two Types Of Surfaces: Permeable Mineral And Clinker Pavement (Paths, Squares, Hardening For Small Architecture) - Construction Of Stairs And Edges - Supplementation Of Existing Surfaces, And Construction Of Small Architecture Objects, Including: - Preparation Of The Area For Assembly - Purchase And Installation Of Objects And Small Architecture: Benches 18 Pcs., Deckchairs 2 Pcs., Waste Bins 12 Pcs., Seat 1 Pc., Gazebo 1 Pcs., Platform Pcs. 1 - Works No. Electrical Installation, Including The Construction Of Decorative Lighting And Replacement Of Park Lighting With Energy-Saving Ones, Including: - Dismantling Existing Lighting Fixtures, - Purchase And Installation Of New Lighting Poles, - Expansion Of The Electrical Installation (Installation Of New Lighting Cable Lines And Grounding Installation) - Works This Year. Greenery, Including: - Tidying Up The Existing Greenery By Carrying Out Maintenance Treatments For High And Low Greenery (Raising Tree Crowns To Improve The Growth Conditions Of Greenery In The Undergrowth) - C
|