Work Detail
(Part-01) Construction Of Rcc Drain Toiab Ali To Abdul Hai Ch-0.0 M To 60.00M At Ward No-04, Under Bagherpara Pourashava,Jashore , (Part-02) Construction Of Rcc Drain For Upzilla Chottor Ch-0.0 M To 35.00M At Ward No-07, Under Bagherpara Pourashava,Jashore. (Part-03) Construction Of Rcc Drain For Shaddkia Kamil Madrasha Ch-0.0 M To 29.00M At Ward No-02, Under Bagherpara Pourashava,Jashore. (Part-04)X-Drain For Carpeting Road Beside H/O Mr. Shoriful At Ward No-04 Under Bagherpara Pourashava,Jashore. (Part-05) Construction Of Brick Flat Soling For (01) Raipur Carpeting Road To (A) H/O Mr. Anisur-30.0M,(B)H/O Mr.Shamoir-17.0M,©Shudhir Davnath-24.0M At Ward No-01, (02) Raipur Carpeting Road To (D) H/O Mr. Abdur Rahim-25.0M,E)Palisading For Khankh Sharif Mosque Side Pond-18.0M At Ward No-02 (03) (F) H/O Mr.Anwor S/Omr.Ahadulla-5.0M,(G)H/O Mr.Shab Ali-24.0M At Ward No-03 (04) (I) H/O A.Hai To H/O Billal-46M,(J) H/O Mr.Nur Hasan (Laltu)-35M At Ward No-04 (05)K)Reparing Bc Road To H/O Mr.Mithu-28.5M At Ward No-06 (06) (L) Bc Road To H/O Nima Fardousi-19M, At Ward No-08 (07)(M)Bc Road To H/O Mr. Boshir-28M (N) Bc Road To Shop Of Kamal -15.0M At Ward No-08 (08) (O)Bc Road To H/O Mr.Anwor-27.8M,(P) Bfs Road To H/O Mr.Anwor-15.3M At Ward No-09 (Q) Ac For Pourashava Engineering Section Under Bagherparapourashava Jashore.
View Notice Now...
Fill Detail for Getting Instant Access
Instant Access