|
Canvas Work Sign Digital Printing Sudecap Pattern Canvas Work Sign Digital Printing Sudecap Pattern, Siding With Wooden Plywood Af_03/2024 Siding With Wooden Plywood Af03/2024, Final Cleaning For Delivery Of The Work Final Cleaning For Delivery Of The Work, Permanent Cleaning Of The Work: 01 Employee X 4 Hours Daily Permanent Cleaning Of The Work Work: 01 Employee Tower Type Tubular Scaffolding Assembly And Dismantling Of Tower Type Tubular Scaffolding (Excluding Scaffolding And Cleaning). Af_03/2024, Black Plastic Tarpaulin 150 Microns Black Plastic Tarpaulin 150 Microns (Service), Including Supply - 200 Microns - 8X100 M, Mobilization, Inst. And Demobilization To Execute Percussion Survey Mobilization, Inst. And Demobilization For Execution Of Percussion Survey (Nbr 6484:2020), Local Construction Administration For Large Works Local Construction Administration For Large Works With A Value Above R$300 Thousand (Limited To 3% Of The Total Value Of The Work/Contract), Art - Technical Responsibility Note - Band 02 - Contracts Above 15 Thousand Art - Note Of Technical Responsibility - Level 02 - Contracts Over 15 Thousand, Demolition Of Masonry For Any Type Of Block, In A Mechanized Way, Without Reuse Af_09/2023, Demolition Of Cemented Floor Or Mortar Subfloor Including Removal Demolition Of Cemented Floor Or Mortar Subfloor Including Removal (Service), Manual Demolition Of Ceramic Floor Or Hydraulic Tile, Including Removal Manual Demolition Of Ceramic Floor Or Hydraulic Tile, Including Removal And Stacking, Excluding Demolition Of Subfloor, Transport And Removal Of Demolished Material., Demolition Of Simple Concrete Floor, Mechanized With Hammer, Without Reuse Demolition Of Simple Concrete Floor, Without Reuse. Af_09/2023, Demolition Of Reinforced Concrete Pillars And Beams Demolition Of Reinforced Concrete Pillars And Beams, Mechanized Using A Hammer, 097633. Demolition Of Ceramic Coating, Manually, Without Reuse. Af_09/2023 Demolition Of Ceramic Tiles, Transportation Of Demolished Material In A Bucket, Excluding Manual Or Mechanical Loading. Hydraulic Installations, Diameters Smaller Or Equal To 40Mm Manual Hole In Masonry, Diameters Smaller Or Equal To 40Mm_ Af_09/2023, Manual Linear Tear In Masonry, For Conduits, Diameters Smaller Or Equal To 40Mm Manual Linear Tear In Masonry, Diameters Smaller Or Equal To 40Mm. Af_09/2023, For Branches/Distribution Of Hydraulic Installations... Manual Linear Tear In Masonry, For Branches/Distribution Of Hydraulic Installations With Diameters Smaller Or Equal To 40Mm. Af_09/2023, Mechanized Linear Tear In Subfloor, For Branches/Distribution Of Hydraulic Installations Mechanized Linear Tear In Subfloor, For Branches/Distribution Of Hydraulic Installations Diameters Greater Than 40Mm And Smaller Or Equal To 75Mm. Af_09/2023_Ps, P/Ramais/Dist. From Install Hidr, Larger Diameters 75Mm And Smaller.100Mm Mechanized Linear Tear In Subfloor, For Branches/Distribution
|