|
Preventive Maintenance (Pmoc). Hygiene And Preventative Maintenance In Air Conditioning Systems, Covering Cleaning And Conservation Of Equipment To Ensure Efficiency, Safety And Air Quality. Includes The Issuance Of The Maintenance, Operation And Control Plan (Pmoc), With A Technical Responsible Person (Rt Or Trt), Prepared In Accordance With Current Technical Standards And Following The Established Maintenance Calendar. Quarterly Service., Corrective Maintenance Of Air Conditioning 1. Replacement Of Main Components, Replacement Of Compressor (Hermetic, Semi-Hermetic Or Scroll), Replacement Of Damaged Condenser Or Evaporator, Replacement Of Fans, Electric Motors And Propellers, Replacement Of Electronic Command Or Control Boards, Replacement Of Pressure Switches, Sensors Temperature And Thermostats. 3. Complementary Services: Repair Or Replacement Of Condensate Trays, General Retightening Of Electrical Connections. 4. Testing And Finalization: System Function Test After Repair; Pressure, Current And Temperature Measurements; Issuance Of A Technical Report With A Record Of Replaced Parts; Update Of Data Book And Maintenance History., Services With Vacuum Refrigerant Fluid In The System To Remove Moisture, Refrigerant Fluid Charge (R-410A, R-22, R-32), Nitrogen Tightness Test; Use Of (Flush) For Internal Cleaning Of Lines., Installation - 9,000 Btus Air Conditioning - Other Specifications Inserted In The Terms Of Reference. With Issuance Of Art Or Trt (Technical Responsibility Note). (Semus). Note: All Material Required For Installation From 02 To 05 Meters., Installation - 12,000 Btus Air Conditioning - Other Specifications Inserted In The Terms Of Reference. With Issuance Of Art Or Trt (Technical Responsibility Note). Note: All Material Required For Installation From 02 To 05 Meters, 03/26/2026 - 15:55:06, 03/26/2026 - 15:55:07, 03/26/2026 - 15:55:09, Installation - 48,000 Btus Air Conditioning - Other Specifications Inserted In Term Of Reference. With Issuance Of Art (Technical Responsibility Note). (Semus), Installation – Air Curtains - Other Specifications Inserted In The Term Of Reference With The Issuance Of Art (Technical Responsibility Note). (Semus). Note: All Material Required For Installation From 2 To 5 Meters Technical Specifications Detailed In The Term Of Reference., Uninstallation Of Air Conditioning Devices - With Capacity From 30,001 To 48,000 Btus According To Other Technical Specifications Detailed In The Term Of Reference, Value Available For Supply Of Various Parts To Be Used In Maintenance And Repairs Of Equipment. Value Described For The Parts Is Not Bidable. See Application According To Item 3.1 Of The Terms Of Reference.
|