Laboratory Building Construction Work – 26E40019; Laves House 1 Braunschweig; Replacement New Building; Pollution Remediation And Demolition Work. Complete Demolition Of A Building, Including Remediation Of Harmful Substances And Dismantling Of Technical Installations. Building Dimensions: Approx. Lxwxh = 48M X 24 M X 22.59 M (5 Floors, Plus Basement) Gross Floor Area = Approx. 5,926 M2, Gross Volume: Approx Above) - Special Construction Site Equipment For Pollutant Removal (2-4 Chambers) - Dismantling And Disposal Of Pollutants Approx. 1,070 Tons, Including Post-Cleaning Work - Demolition Of The Entire Basement, Including Foundations And Later Filling - Loosen And Remove Approx Dismantling Work - Dismantling The Curtain Wall, Window Surfaces, Roofs, Etc. - Demolition Of 1 Piece Of Prefabricated Garage / Storage Rooms - Disposal / Demolition Dismantling Approx. 11,280 Tonnes Of Electrical Engineering - Approx. 30M3 Demolition Of Cable Routes, Holding Systems, Electrical Lines, Etc. - Approx. Low-Voltage Main Distribution Systems, Etc. - Approx. 5M3 Demolition And Disposal Of Bma, Switches, Sibel, Intercom Systems, Etc. - Provision Of A Construction Power Supply For The Dismantling And Demolition Work Hls And Laboratory Technology Sanitary, Technical Gases, Heating, Ventilation, Refrigeration And Msr Technology - Approx. 14,700 M Waste Water, Drinking Water, Gas, Heating And Refrigeration Pipes, - 67 Pieces Of Sanitary Objects Made Of Sanitary Porcelain Or Stainless Steel With Fittings - 3 Pcs. Central Drinking Water Systems Such As Storage, Distributor And Separation Station - 4 Pcs. Compressor And Vacuum System With Storage, Dryers, Filters - 215 Pcs. Sectional Radiators Made Of Sheet Steel And Cast Iron - 4 Pcs. Central Heating Systems Such As District Heating Transfer Station (600 Kw), - 2 Pcs. Central Ventilation Devices Up To 55,000 M³/H, Including Fastenings - 38 Pcs. Exhaust Fans Made Of Sheet Steel Or Plastic Up To Dn 300 - 2,000 M² Ventilation Duct And Ventilation Pipes Made Of Sheet Steel Or Plastic - 219 Pcs. Ventilation Installation And Attachment Parts - 1 Pc. Central Refrigeration System, Including Refrigeration Machine, Dry Coolers, Hydraulic Module, - 12 Pcs. Small Refrigeration Systems In Split Design, Including Indoor And Outdoor Units, - 6 Pcs. Control Cabinet Sheet Steel, Including Approx. 30,000 M Of High- And Low-Current Cables - 200 Pieces. Control And Shut-Off Valves, Field Devices - 20 M² Of Thermal Insulation, Containing Kmf On Heating Pipes - 37 Pieces. Fire Dampers, Containing Asbestos, In Ventilation Systems, Partly Mortared In Mw Laboratory Equipment - Approx. 68 Laboratory Rooms With Equipment From Work Tables, Equipment Cabinets, Laboratory Tables, Fume Hoods, Cupboards, Exhaust Gases, Side Walls, Wall Cupboards, Etc. - Remediation Of Pollutants Elevator Technology - Dismantling And Disposal Of Passenger Elevator, Schindler, Built In 1981, Traction Sheave Technology In The Mr As Well As Preparation Of The Demolition Statics, A Demolition Concept, The Disposal Certificates, Documentation, Etc. Previous Use As An Office And Laboratory Building
|