Architectural, Construction, Engineering And Inspection Services – Dstlg. Todendorf - Generalplanerleistungen. The Electric Energy Supply Systems At The Bundeswehr Property In Todendorf Are To Be Renewed. The Ipu Was Set Up And Qualitatively Tested. A General Planning Office Is Being Sought To Set Up The Fpu. The Tasks Essentially Cover The Kg 440 Medium And Low Voltage Systems, The Kg 450 Telecommunications And Information Technology Systems And Kg 480 Building Automation. Shares Of Kg 300 Are Included For The Preparation Of The Transformer Station Buildings And The Locations Of The Main Building Distribution Boards To Be Replaced In The Buildings. The Planning Services Of Kg 500 Must Also Be Provided For The Cable And Line Routes As Well As Empty Piping And Pull Shafts. The Electrical Connection To The Public Network Is Currently Carried Out Via A 20 Kv Medium-Voltage Connection From Schleswig-Holstein Netz Gmbh. There Are 15 Customer-Owned Transformer Stations On The Property, Which Supply All Buildings On The Property Via Low-Voltage Connections. The Propertys Dilapidated Power Grid Is To Be Replaced. The Current Vnb Network Connection Is Good At 947 Kva. The Cables In The Ms Network Are Mostly Old And Loose. Some Routes Have Already Been Renewed And Should Continue To Be Used If Possible. The Ms Network With The Transformer Stations Must Be Designed For Future Power Requirements. The Majority Of Transformer Stations Need To Be Replaced. The Property Will Be Massively Expanded In The Near Future. Various New Construction And Renovation Measures Are Pending. A Performance Balance Must Be Drawn Up. Data Collection Is Necessary To Create The Performance Balance. The Actual Required Power And Energy Requirements Must Be Determined And Documented For Each Building. The Same Applies To All Low-Voltage Main Lines Into The Buildings And The Medium-Voltage Cables. If Possible, The Documentation Should Be Created In Tabular Form In A Cadastre And At The Same Time As An Overview In Site Plans. The Upcoming Pv Systems, The Chp And The Connection Columns For E-Mobility Must Be Taken Into Account Here. Since A Massive Increase In Power Requirements Is Expected Due To The Upcoming New Construction And Renovation Work, The New Transformer Stations Must Be Repositioned According To The Load Centers. The Load Extremes For The Power Consumption As Well As For The Power Generated Via The Pv Generators Must Be Taken Into Account Here. The Central Heat Supply Is The Outstanding New Load Focus. The Development Process Of The New Central Heat Supply System, Which Is Taking Place Almost Parallel To This Measure, Is Also Crucial For The Overall Electrical Power Balance, Since The Requirements Of The Geg Are To Be Met Using A Heat Pump. The Currently Maximum Available Reference Energy From The Utility Network Is Expected To Be Exceeded. The Rough Determination Of The Pv Potential Also Results In A Need To Strengthen The Propertys Grid Connection. The Need For Expansion Is
Contact Information
Address
Küterstraße 30 Küterstraße 30 24103
Contact No.
+494315992300
Email
E-Vergabe-Fbdl@gmsh.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110981026
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.