Assembly And Erection Of Prefabricated Structures – Replacement Of Damaged Noise Shielding Walls. The Task Of The Successful Bidder Is To Restore The Damaged Noise Shielding Walls And Bird Protection Walls Indicated By The Contracting Authority Along The National Road Network (Public Roads And Expressway Sections) Managed By The Contracting Authority. Damaged Noise Shielding Walls And Bird Protection Walls Need To Be Implemented For Traffic Safety Reasons And To Protect Properties Adjacent To The Road From Traffic-Related Noise. The Indicated M2 Data Are Estimated Quantities. Central Hungary: Replacement Of Wooden Concrete Sound-Absorbing Wall Element (M2): 105 Replacement Of Wooden Braided Noise-Absorbing Wall Element (M2): 45 Replacement Of Polycarbonate Noise-Absorbing Wall Element (M2): 10 Replacement Of Glass Noise-Absorbing Wall Element (M2): 5 Other Regions Of The Country Together: Replacement Of Wooden Concrete Noise-Absorbing Wall Element (M2): 105 Replacement Of Wooden Braided Noise-Absorbing Wall Element (M2): 45 Replacement Of Polycarbonate Noise-Absorbing Wall Element (M2): 10 Replacement Of Glass Noise-Absorbing Wall Element (M2): 5 Total: Replacement Of Wooden Concrete Noise-Absorbing Wall Element (M2): 210 Replacement Of Wooden Braided Noise-Absorbing Wall Element (M2): 90 Replacement Of Polycarbonate Noise-Absorbing Wall Element (M2): 20 Replacement Of Glass Noise-Absorbing Wall Element (M2): 10 That The Above Quantities Are Only For The Information Of The Winning Bidder And Are Not To Be Considered As The Exact Quantity Statement Of The Order To Be Actually Fulfilled Under The Contract. The Tenderer Reserves The Right To Place An Order For The Task To Be Performed In Any Quantity Distribution Within The Framework Amount, Regardless Of The Informational Quantities Determined In Advance. The Orders For The Mostly Low-Value, Individual Works To Be Performed Will Be Made Up To A Maximum Net Amount Of Huf 100,000,000, Depending On The Actual Procurement Needs (Case Orders). The Tenderer Undertakes To Draw Down 70% Of The Total Amount (Ie Up To A Net Value Of Huf 70,000,000), And Stipulates That He Is Not Obliged To Draw Down The Amount Above This Amount. The Quantities Per Lot Of The Specific Works To Be Performed, As Well As The Individual Technical, Traffic Management And Construction Requirements, Are Specified By The Bidder In The Individual Orders. The Tenderer Determined The Framework Amount (Available Cover) Based On Estimated Unit Prices Based On Planned Quantities For Evaluation Purposes. The Tenderer Reserves The Right That If All Valid Tenders (Which Are The Unit Price Multiplied By The Planned Quantities For The Purpose Of Evaluation) Are Submitted Above The Specified Amount, The Procedure May Be Closed Without Success By Kbt. Based On Point B) Of § 75, Subsection (2), Where Applicable. Tenderer Is The Kbt. On The Basis Of Section 75 (4), The Available Cover Was Determined In The Framework Amount, Which Will Also Be Disclosed In The Demolition Report. The Detailed Technical Information Is Contained In The Technical Description Chapter Of The Public Procurement Documents.
Contact Information
Contact No.
+36 300728646
Email
apati.bence.zoltan@mavcsoport.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110975592
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.