Sanitary Fixture Installation Work – New Childrens Home Reichenbach - Sanitary. The Construction Project Involves The Construction Of A New Daycare Center In Reichenbach An Der Fils With Two Full Floors. The Building Does Not Have A Basement. The Tendered Measure Involves The Installation Of The Water And Wastewater System. The Resulting Dirty And Rainwater Is Drained Away In Separate Gravity Systems. The Dirty Water Is Drained Away Via Newly Laid Underground And Collecting Pipes And Leads To The Sewerage System Outside The Building. The Following Drainage Objects Or Wastewater Are Connected To The Wastewater System: • Washbasins And Sinks • Showers, Tubs • Toilets • Kitchen • Kitchenette • Floor Drains Since All Points To Be Drained Are Above The Backflow Level, No Lifting System Needs To Be Provided. The Internal Dirty Water Connection, Downfall And Collection Pipes Are Planned As Sound-Insulated Plastic Pipes (Pe Material). The Basic Pipes Were Tendered Separately And Will Be Laid By The Shell Builder. The Building Is Supplied With Drinking Water Via A House Connection Pipe From The Location On The Ground Floor Of The Building, Which Is Connected To The Respective Distribution Networks After Metering And Filtering. The House Connection Is In The Technical Center On The Ground Floor. The Pipeline Materials Are Stainless Steel Pipes (1.4521) With Press Fitting Systems And Dvgw-Tested Gunmetal Fittings. Multi-Layer Composite Pipes Should Be Used Within Installation Walls Due To Their Easier Installation. In Addition, The Entire Drinking Water Installation Within The Building Must Be Insulated. The Sanitary Facilities Are Equipped In Accordance With The Sampling List. Two Frost-Proof External Fittings Are Provided On The Facade For Outdoor Use. Hot Water Is Prepared Via Electric Instantaneous Water Heaters, Which Are Arranged At Pooled Tap Points. The Following Tapping Points Receive A Hot Water Supply: • Washbasins • Barrier-Free Washstands • Sink • Kitchenette • Kitchen • Showers • Changing Tables To Ensure The Hygiene Requirements For Drinking Water Systems, The Drinking Water Network Is Designed In Such A Way That Stagnation And Unacceptable Heating Is Avoided. This Is Achieved, Among Other Things, Through Smooth Laying And The Installation Of Automatic, Time-Controlled Flushing Stations After The Last Removal Points. A Total Of 4 Automatic Flushing Stations Are Used In The Building. The Fault Messages From The Hygiene Flushes Should Be Able To Be Transmitted To The On-Site Knx System.
Contact Information
Address
Hauptstraße 7
Contact No.
+49 715350050
Email
khrb-reichenbach@nps-pm.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110974347
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.