The Subject Of The Order Is The Implementation Of The Task: Iv Secondary School Ul. Kozielska 1A - Modernization Of The Fence - Construction Works, Which Consists Of 1) Construction Works, In Particular: A) Demolition And Construction (Reconstruction) Of A Retaining Wall With The Function Of A Fence Along With The Reconstruction Of Field Stairs At Ul. Kozielska 1A And Reconstruction Of Paving Stones On The Section From The Field Stairs To The Entrance To The Building From Ul. Kozielska, B) Obtaining An Ornithological And Chiropterological Opinion Before Felling Four Blue Spruce Trees On The Plot No. 1688, Nowe Miasto District. 1461, Old Town Area, Specified In The Map Appendix Attached To The Design Documentation. Compensatory Plantings Along With Accompanying Works And Activities Necessary To Carry Out The Construction Works Described In This Contract, 2) Obtaining A Decision On The Occupancy Permit, Reporting The Completion Of Construction Works/Construction To The Construction Supervision Authority (If Necessary), 3) Preparing Complete As-Built Documentation. A Detailed Description Of The Subject Of The Contract Is Included In: 1) The Specification Of The Terms Of The Contract And In The Template Contract, 2) Design Documentation Consisting Of: Construction Design, Executive Design, Specifications For The Execution And Acceptance Of Construction Works And Formal Documents For The Task: Iv Secondary School Ul. Kozielska 1A - Modernization Of The Fence - Design Documentation And Decision No. Decision No. Ab-41/2024 Of January 24, 2024 On The Construction Permit Constituting An Annex To The Specifications Of The Terms Of The Contract, With The Ordering Party Introducing The Following Changes: A) The Scope Of Renovation Of The Fence In Section A-B Near The Norway Maple Tree Is Changed. The Tree In Question Is Not Subject To Felling And Should Be Secured For The Duration Of Construction Works. B) The Wall Should Not Be Demolished In The Section Of Three Spans In The Place Marked In The Drawing Retaining Wall, Section A_B. All You Need To Do Is Replace The Top Layer Of Brick, Repair Any Defects In The Fence And Renovate The Caps And Spans Of The Fence In Accordance With The Technical Description In The Design Documentation. Brick Elements And Caps On The Fence Foundation Should Be Painted With An Anti-Graffiti Coating. The Indicated Section Should Be Consistent With The Entire Fence And Made In Accordance With The Comments Presented In The Drawing Retaining Wall, Section A_B.C) The Scope Excluded From The Subject Of The Order Is The Renovation Of The Stairs Located At The Entrance To The School In Accordance With Annex Development 1A - Scope Of The Task. D) The Surfaces Of The Paving Stones Should Be Adjusted Along The Designed Stairs In Accordance With The Drawing Renovation Of Stairs - Scope Excluded From The Order. 1461, Stare Miasto District, Should Be Carried Out In The Location Specified In The Attachment Compensatory Plantings. The Amount Tha
Contact Information
Address
Miasto Gliwice,Gliwice,44-100,Śląskie,Pl229 - Gliwicki
Contact No.
+48322385530
Email
or@um.gliwice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110970766
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.