|
The Subject Of The Order Is The Execution Of Construction Works Consisting In The Construction Of A Playground On Plot No. 240/30 In Piotrowice As Part Of The Project: Reconstruction And Renovation Of The Kindergarten Building In Piotrowice, Co-Financed By The European Union From The European Regional Development Fund Under The European Funds For Lublin Program 2021-2027, Measure 7.5 Educational Infrastructure Under Integrated Territorial Investments (Project Type 1, 2, 3, 4, 5, 6) Priority Vii Better Accessibility To Social And Health Services, Co-Financing Agreement Number: Felu.07.05-Iz.Oo-0013/25-00. The Area Of The Manor And Park Complex In Piotrowice Is Under Conservation Protection. The Following Works Are To Be Performed: 1) Earthworks, 2) Construction Of Surfaces: Sandy, Grassy And Mats Hypertrophic,3) Playground Equipment: Board With Playground Regulations - 1 Pc, Game Boards - 4 Pcs, Play Set: Tower, Slide, Stairs And Climbing Wall - 1 Set, Rope Set: Platform, Balance Beam, Tower And Climbing Wall - 1 Set, Cross Ladder - 1 Pc, Tunnel - 1 Pc, Rope Bridge - 1 Pc, Set Playground: Tower, Slide, Cat Rope Ridge, Pipe With Steps, Climbing Wall - 1 Set, Double Swing - 1 Pc, Sandbox - 1 Pc, Sandbox Roof - 1 Pc, Weight Swing - 1 Pc, Carousel - 1 Pc, Spring Rocker - 1 Pc, Locomotive With Wagon - 1 Pc, House With Veranda - 1 Pc., Single Swing - 2 Pcs., Double Storks Nest Swing - 1 Pc.,4) Small Architecture: Benches With Backrest - 6 Pcs., Waste Bins - 3 Pcs.,5) Fencing Of The Area Necessary Documentation, - Participation In The Acceptance By The Competent Authorities In Accordance With Applicable Regulations. The Detailed Scope, Requirements And Conditions For The Performance Of The Works Covered By The Subject Order Are Specified In The Construction And Technical Designs, Bills Of Quantities And Technical Specifications For The Execution And Acceptance Of Construction Works, Which Constitute Annexes To This Swz. The Contractors Obligations Under The Task And The Offer Price Include: 1) Execution Of The Subject Of The Contract In Accordance With The Design Documentation, Construction Practice And Principles Of Technical Knowledge, Applicable Standards And Legal Provisions. Construction, On The Terms And Conditions Set Out In This Contract And With Due Care And Within The Contractual Deadlines;2) The Contractor Is Responsible For Full Control Of The Works And The Quality Of The Incorporated Materials. The Contractor Will Provide An Appropriate Control System, Including Staff, Laboratory, Equipment, Supplies And All Devices Necessary For Sampling And Testing Of Materials And Works;3) Submitting, Before Signing The Contract, A Copy Of The Construction Managers Qualifications In The Construction Specialty Or The Corresponding Equivalent Construction Permissions Issued Under Previously Applicable Regulations, And In The Case Of Contractors Foreign - Construction Authorizations To Manage Equivalent To Those Indicated Above. Due To The Fact That The Work
|