|
1. The Subject Of The Order Is The Construction Of An Internal Gas Installation And Internal Central Heating Installations. Based On Dual-Function Gas Boilers In Apartments No. 1, 2, 3, 4, 5, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20 Of A Multi-Family Residential Building At Ul. Warszawska 13 In Częstochowa.2. The Scope Of Work Is Consistent With The Construction Design.3. The Scope Of Implementation That Covers The Subject Of The Order Is Included In The Bill Of Quantities Constituting Annex No. 7 To The Swz, The Technical Specification Constituting Annex No. 8 To The Swz And The Construction Design Constituting Annex No. 9 To The Swz. In The Offer Price, The Contractor Must Include All Costs Necessary To Complete The Order, Resulting Directly From The Swz, As Well As Those Not Included Therein And Without Which The Order Cannot Be Performed. 4. The Bill Of Quantities Constituting Annex No. 7 To The Swz Is Only Auxiliary Material. Even If The Bill Of Quantities Does Not Include The Entire Scope Of Works, The Works Must Be Valued And Performed In Accordance With: - Construction Design, - Stwiorb And Applicable Technical Regulations, - Technical Knowledge, - Provisions In This Swz. Therefore, Before Commencing The Proceedings, The Contractor May Carry Out A Local Inspection Of The Places Where The Works Will Be Performed. Carrying Out A Site Visit Is Not Obligatory. The Offer Of A Contractor Who Does Not Carry Out An On-Site Inspection Will Not Be Rejected. The Ordering Party Does Not Require The Contractor To Check The Documents Necessary To Complete The Order, Referred To In Art. 131 Section 2 Of The Public Procurement Law.5. Acting In Accordance With Art. 95 Section 1 And 2 Point 1 Of The Public Procurement Law, The Ordering Party Requires The Contractor Or Subcontractors To Employ, Under An Employment Relationship, Persons Performing The Following Activities Within The Scope Of Contract Execution, If The Performance Of These Activities Involves Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code, Including: 1) The Ordering Party Requires That All Persons Implementing The Subject Of The Order Who Will Perform Actual Activities Related To The Subject Of The Order, I.E. Gas Installation Fitter - Profession Code 712603 And/Or Construction Worker - Profession Code 71 According To The Classification Of Professions And Specialties Specified In The Regulation Of The Minister Of Labor And Social Policy Of August 7, 2014 On The Classification Of Professions And Specialties For The Needs Of The Labor Market And The Scope Of Its Application Related To The Subject Of The Order Described In The List Of Works - Quantity Surveying And Stwiorb, Were Employed On The Basis Of An Employment Relationship, 2) The Contractor Or Subcontractor Employs The Above-Mentioned Persons For The Period Of Execution Of The Order. If The Employment Relationship Is Terminated Before The End Of This Period, The Employee Undertakes To Immedi
|