|
1. The Scope Of The Order Includes The Preparation Of Design Documentation Necessary To Obtain A Decision On The Permit For The Implementation Of A Road Investment And The Execution Of Construction Works, Including: 1) Preparation Of A Current Situational And Height Map For Design Purposes At A Scale Of 1:500, 2) Execution Of Traffic Measurements, Traffic Intensity Studies Along With The Directional And Generic Structure Of Traffic In Accordance With The Guidelines For Conducting Traffic Measurements Obtained From The Road And Communication Authority In Tarnów, 3) Preparation Of An Expansion Concept Roundabout At The Intersection Of Klikowska, Słowackiego, Szkotnik Streets, Along With Connections To Adjacent Streets In 2 Variants (E.G. Turbine Roundabout, Eight-Dumbbell Roundabout Or Other), Taking Into Account The Results Of The Research Referred To In Point 2.4) Based On The Concept Approved By The Ordering Party, Preparation Of Design Documentation (Construction Design And Detailed Designs) Necessary To Obtain A Road Investment Permit Decision (Zrid) And The Implementation Of Works For The Scope Indicated Below: A) Expansion Of The Roundabout With Its Inlets And Connections To Adjacent Streets According To The Approved Concept, B) Construction Of A Storm Sewage System With Drainage To The Receiver, C) Construction Of Pedestrian Roads, Bicycle Paths Or Pedestrian Paths And Bicycles, Pedestrian Crossings And Bicycle Crossings With Adaptation Of Design Solutions To The Needs Of People With Special Needs, D) Construction Of Street Lighting, E) Construction Of A Technological Channel, F) Construction Of A Fiber-Optic And It Network As Well As Cctv Monitoring And Traffic Measurement Using Anpr Cameras - Telecommunications Network, G) Securing, Relocating And Rebuilding Underground And Above-Ground Technical Infrastructure Devices, Resulting From The Technical Conditions Obtained From Their Users, To The Extent Necessary To Remove The Collision, 5) Preparing A Geotechnical Opinion To Document The Ground And Water Conditions Together With Carrying Out Geological Research To The Extent Necessary To Properly Prepare Documentation And Others According To The Needs Imposed At The Stage Of Agreeing Or Reviewing The Project,6) Obtaining Technical Conditions From Network Operators And The Roads And Communications Authority In Tarnów In The Field Of Street Lighting, Rainwater Drainage, Technological Channel, Its (Fiber Optic Network),7) Obtaining All Documents Required By Law, Such As Decisions, Permits, Approvals, Arrangements, Opinions, Reports, Derogations From Regulations, Etc., Which Are Necessary To Obtain A Zrid Decision, 8) Preparation Of A Permanent Traffic Organization Project Together With Its Evaluation, 9) Preparation Of An Inventory Of Greenery, 10) Preparation Of A Greenery Planting Project, 11) Preparation Of Technical Specifications For The Execution And Acceptance Of Construction Works, 12) Preparation Of Bills Of Quantities Of Works Divided
|