|
The Subject Of The Order Is: Change Of Use Along With The Reconstruction Of A Former School Building Into A Care Center As Part Of The Project Entitled: Strengthening The Potential Of The Social Assistance And Integration System In The Hrubieszów Functional Area Through The Creation Of A Care Center In Dziekanów With A Rental Of Care And Rehabilitation Equipment. The Order Mainly Includes: - Demolition Works: Dismantling The Existing Guttering, Sheet Metal Flashings, Construction Of Smoke Exhaust Window Openings - Disassembly Of Some Materials, Places Of Cut Holes, Disassembly Of Door And Window Frames Intended For Replacement, Dismantling Of Fragments Of Ceilings In The Staircase, Dismantling Of Walls, Dismantling Of Internal Stairs To Adapt To Technical Conditions, Dismantling Of Fittings And Sanitary Utensils In Bathrooms, Dismantling Of Sanitary And Electrical Installations, Cutting Holes In The Ceilings For Installation Shafts And Roof Hatches, Dismantling Of External Stairs; - Works Structural: Foundations For The Designed Internal Walls, Columns - Reinforced Concrete Ceiling - Reinforced Concrete Beams - Tie Beams - Stairs At The Staircase, Wooden Ceiling At The Main Entrance; - Works On The Roof Structure: Repairs Of The Existing Truss, Extension Of The Roof Structure, Protection Of Wooden Elements, Painting Of The Roof Covering, Roofs At The Side Entrances, Terrace Roofing, Gutters And Sheet Metal Work; - Masonry Work: Bricklaying And Construction Of New Walls; - Window And Door Joinery: Installation Of Door And Window Joinery, Smoke Exhaust Window, Attic Hatch, Internal Window Sills, Roller Blinds, Blinds; - Facade Finishing: Insulation Of Foundation Walls, Wall Insulation, Facade Plasters, External Window Sills, Balustrades And Stair Handrails, Sheet Metal Flashings; - Internal Finishing: Floors, Walls, Ceilings; - Planned Landscaping: Construction Of Concrete Block Surfaces - Sidewalks, Access Roads, Parking Lots, Elements Of Small Architecture, Construction Of External Entrance Stairs, Construction Of A Terrace, Stair Ramp At The Main Entrance, Construction Of External Entrance Stairs; - Construction Of A Fence: Construction Of A New Fence And Cleaning And Painting Of The Existing Fence; - Sanitary Works: Water Installation, Internal Hydrant Installation, Sewage, Central Heating, Mechanical Ventilation, Air Conditioning; - Electrical Works: Building Power Supply, Installation Of Installation Equipment And Cabling, Internal Lighting, Sockets, Switchboards, Lightning Protection Installation, Cctv Ip, Installation Reducing Barriers For People With Special Needs, It Cabling. A Detailed Description Of The Subject Of The Order Is Attached As Annex No. 3 - Design Documentation And Annex No. 4 - Technical Specification For The Execution And Acceptance Of Construction Works. Before Signing The Contract, The Contractor Will Submit To The Ordering Party An Offer Cost Estimate Prepared Using The Detailed Method, Indicating The Method Of Calculat
|