1. The Subject Of The Order Is Improvement Of Access To Small Public Infrastructure By Modernizing The Waterfront Of Lake Myślibórz. 2. The Subject Of The Order Includes The Expansion Of The Existing Quay Along With The Construction Of Five New Floating Piers And A Lighting Network. 3. Expansion Of The Quay: A. Length Of The Quay: 35.50 Meters. Sidewalk Length 37.00 Mc. Construction Type: Concrete Cap On Steel Piles With A Sidewalk Made Of Paving Stones D. Width Of The Quay: 2.00 M, Including: I. Cap Width 0.40 M. Pavement Width 1.60 M4. Floating Piers: A. Quantity 5 Pcs. Single Length 2.0 M C. Single Width 2.0 M D. Construction Type High Density Polyethylene Floats5. Waterfront Lighting Network:A. Length 56.20 Meters. Number Of Lighting Fixtures 5 Pcs. Yaky Lighting Cable Type 4X16 Mm2 In A Protective Tube Ø75 Mm6. Operation Co-Financed By The European Union Under The Strategic Plan For The Common Agricultural Policy For 2023-2027 (Cap Ps 2023-2027), Intervention I.13.1 Leader/Community-Led Local Development (Clld), Component: Implementation Of Lds.7. The Employer Allows The Use Of Equivalent Solutions For The Temporary Protection Of The Works (Dams), Including Other Methods Or Technologies, Provided That The Contractor Demonstrates That They Ensure At Least An Equivalent Level Of Safety, Structural Stability And Protection Of The Water Area, E.G. Temporary Protection Of The Works With A Flood Barrier Filled With Water From The Lake.8. The Contractor Is Obliged To: A. Preparation (Design), Implementation, Delivery And Installation Of An Information Board Regarding Co-Financing Of The Operation, B. Ensuring That The Information Board Meets The Requirements Specified In The Current Guidelines On Information And Promotion For The Cap Ps 2023–2027, In Particular In Terms Of: I. Required Logos (Eu/Ps Cap),Ii. Minimum Dimensions And Graphic Layout,Iii. Mandatory Content,Iv. Durability And Resistance To Weather Conditions, C. Agreeing With The Ordering Party On The Graphic Design Of The Board Before Its Implementation (The Ordering Partys Acceptance Is A Condition For The Implementation Of The Board), D. Placing The Board In The Place Indicated By The Ordering Party, E. Including All Costs Related To The Production, Delivery And Installation Of The Information Board In The Offer Price.9. The Description Of The Subject Of The Order Is The Design Documentation, In Particular The Construction Design, Detailed Design, Technical Specifications For The Execution And Acceptance Of Construction Works And Other Documents Constituting An Integral Part Of The Documentation.10. The Bill Of Quantities Is Of An Auxiliary Nature And Does Not Constitute The Basis For Preparing An Offer. The Contractor Is Obliged To Make A Valuation Based On The Design Documentation Referred To In Section 9, Taking Into Account All Works Necessary For The Proper Execution Of The Order.11. In The Event Of Discrepancies Between The Bill Of Quantities And The Design Documentation, The Pro
Contact Information
Address
Gmina Myślibórz,Myślibórz,74-300,Zachodniopomorskie,Pl427 - Szczecinecko-Pyrzycki
Email
ue.umig@mysliborz.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110967760
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.