The Task Includes All Activities Related To The Reconstruction And Expansion Of The Volunteer Fire Department Building In Wichrów, I.E.: Preparation Of The Construction Site, Demolition And Dismantling Works, Construction Of Foundations With Reinforcement, Assembly Of The Roof Structure And Formwork Made Of Saturated Timber, Installation Of Gutters And Downpipes, Insulation Of The Flat Roof, Replacement Of External Doors, Installation Of Windows, External Doors, Internal Doors With Frames And Sectional Gate With Automatic Drive, Insulation And Warming Of External Walls, Construction Of A Septic Tank, Replacement Of The Lighting Installation With Energy-Saving Led Fixtures. In Addition, The Task Will Include The Construction Of A Paving Stone Surface With Curbs And The Modernization Of A Sanitary Room. The Order Is To Be Completed On Plots No. 768, Km. 4 And 767, 766, 765 K.M. 2, Registration Unit 160805_2 Radłów, Registration Area 0087 Wichrów. The Subject Of The Contract Covers The Following Scope: 1) Road Works, Including Mechanical Construction Of A Roadbed Along The Entire Width Of The Road And Sidewalks, Mechanical Profiling And Compaction Of The Subsoil For Construction Layers, Laying Of Sand Drainage Layers And Crushed Stone Foundations, Construction Of Concrete Paving Stone Surfaces, Along With The Installation Of Concrete Curbs And Concrete Edges, 2) Demolition Works, Including: Dismantling Of Roof Coverings, Dismantling Of Ceilings Reinforced Concrete And Walls, Pillars And Columns Made Of Bricks In Cement-Lime Mortar, Dismantling Concrete Footings, Footings And Foundations, Dismantling The Gravel Concrete Subfloor And Removing Internal Plasters, 3) Earthworks With Linear Excavations With Vertical Walls For Foundations 4) Construction Of Concrete Sleepers, Expansion Joints From Polystyrene Boards And Reinforced Concrete Foundation Strips From Reinforcement,5) Installation Of Moisture-Proof Insulation,6) Construction Of Walls Made Of Concrete Blocks And Reinforced Concrete Columns, Partition Walls Made Of Ceramic Blocks, Openings For Windows And Doors, Sidelights And Ventilation Ducts,7) Construction Of A Roof Structure Made Of Sawn Timber, Formwork And A New Roof Covering Made Of Coated Sheet Metal Roofing Tiles, Together With The Installation Of Gutters And Downpipes,8) Installation Of Door Joinery And Window, Including Internal Doors And Frames, As Well As A Sectional Gate With Automatic Drive,9) Facade Works Including, Among Others: Vertical Insulation, Insulation, Preparation Of The Substrate For Insulation Using The Light Wet Method, Gluing Polystyrene Boards, Making An Intermediate Layer For Plaster And Applying Silicate Plasters, Double Painting With Silicate Paints, 10) Construction Of Floors, Including Moisture And Heat Insulation, Construction Of Cement Floors And Their Preparation For Tile Floors, And Then Installation Of Tiles And The Construction Of Plinths, 11) Wall Finishing, Including Plastering, Wall Facing And Priming,
|