|
Work Sign, Location Of Point For Topographic Reference, Mobilization, Excavation, Loading And Transportation Of 1St Category Material, 03/25/2026 - 09:11:00, 03/25/2026 - 09:11:01, 03/25/2026 - 09:11:02, Civil Construction Engineer, In Charge Of Work, Regularization And Compaction Of Soil Subgrade, Base For Paving With Dry Macadam, Including Compaction E=15Cm, Base For Paving With Graded Crushed Stone, Transport Of Macadam, Transport Of Base, Execution Of Priming With Diluted Asphalt Cm-30 (1Kg/M2), Transport Of Priming Dmt = 160Km, Execution Of Bonding Painting With Emulsion Asphalt Rr-1C, Emulsion Transport Rr-1C (0.5Kg/M2) Dmt = 160 Km, Pavement Execution With Asphalt Concrete Application, Bearing Layer E=5Cm, Cbuq Transport, Painting Asphalt Road Axis With Acrylic Resin-Based Retroreflective Paint With Glass Mic, Steel Plate N°16 Galvanized With Retroreflective Film Type I + Iii, Galvanized Steel Tube With Seam, Concrete Fck = 15Mpa, Trace 1:3, 4:3, 5 - Preparation, Laying And Thinning, Laying Using Buckets, Thinning And Finishing Of Concrete, Demobilization, Extraction Of Asphalt Concrete Test Body, Resilience In Materials Bituminous, Tensile Strength For Diametral Compression In Cbuq Test Bodies, Bitumen Content, Los Angeles Abrasion, Adhesion To Bituminous Binders (Daer Method)
|