Tenders Are Invited For Electrical Installation Work – Achieving Coexistence Between Lea D.C. Electrical Net ... in Romania
Tender Notice
TenderID
110950406
Tender Brief
Tenders Are Invited For Electrical Installation Work – Achieving Coexistence Between Lea D.C. Electrical Networks. 110Kv Beclean-Viișoara/ Beclean-Coldău And Road Passage Over The Railway Intersection With The Bypass In The City Of Beclean, Bistrita-Nasaud County
Electrical Installation Work – Achieving Coexistence Between Lea D.C. Electrical Networks. 110Kv Beclean-Viișoara/ Beclean-Coldău And Road Passage Over The Railway Intersection With The Bypass In The City Of Beclean, Bistrita-Nasaud County. In Order To Regulate Coexistence With The New Investment And To Comply With The Provisions Of Sr En 50341-2-24-2019 And Anre Order 239/2019 Within The Framework Of This Documentation, It Is Proposed To Replace The Existing Support Pole At Terminal 119 With A New Extension Pole Of Type Icn+6 110262 Located In The Lea Axis At A Distance Of 55M From Existing Pillar No. 119, In The Direction Of Pillar 120 In Accordance With Those Provided In The Feasibility Study And The Documents That Influence And Condition The Technical Solution And The Main Technical-Economic Indicators Related To The Investment Objectives. The Works Proposed Within This Investment Objective Are Described In The Feasibility Study Attached To The Award Documentation. Due To The Fact That In The Existing Situation The Coexistence Conditions Between Lea 110 Kv D.C. Are Not Respected. Beclean-Viisoara/Beclean-Coldau In The Intersection Area Of The Designed Road, It Is Proposed To Carry Out The Following Works: - The Construction Of A Temporary Fence On Wooden Poles For The Opgw Conductor Of Lea Between Poles 118 And 120; - Removal Of Active Conductors From Panel 118-120 - Removal Of The Support Pole From Terminal 119 And Demolition Of Its Foundations; - The Construction Of A New Extension Pole Of Type Icn+6 110262 Located In The Lea Axis At A Distance Of 55 M From The Existing Pole 119; - Equipping Pillars No. 118 And 120 In The Openings To The New Pillar 119 With Double Tension Chains With Cts Insulators; - Equipping The New Pillar At Terminal 119 With Double Tension Chains; - Installation Of New Acsr 185/32 Mmp Conductors In Openings 118-119 And 119-120; - Remounting The Opgw Protective Conductor On The Newly Designed Pole At Terminal 119; - Construction Of The Earthing Socket At The New Pole At Terminal 119; - Checking/Improving The Earthing Sockets At Poles 118 And 120 In Accordance With The Requirements Imposed By The Specifications And The Feasibility Study Documents That Are An Integral Part Of The Award Documentation. The Works Fall Into Category C Of Importance According To H.G. No. 766/1997. Thus, The Minimum Duration Of The Warranty Period Will Be 3 Years According To Law No. 10/1995, Republished, With The Amendments And Additions Brought To It. The Duration Of The Contract Is 10 Months. The Contracting Authority Has Planned The Completion Of The Technical Execution Project And The Execution Details Within The Design Services Within 1 Month From The Issuance Of The Order To Start The Provision Of Services, And The Completion Of The Execution Of The Works Within 7 Months From The Issuance Of The Order To Start The Execution Of The Works To Which Is Added A Term Of 1 Month For The Completion Of The Reception At The End Of The Works.
Contact Information
Contact No.
+40 0263343687
Email
achizitii@primariabeclean.ro
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110950406
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.