Load-Bearing Structure Design Services – Mük - Ks Ewp Specialist Planning, Structural Planning. 1. Overview Of The Overall Measure At The Ags Schwabing Location (Kölner Platz 1, 80804 Munich), München Klinik Ggmbh Intends To Realize A Three-Part Building Complex (Parents House, Farm Yard, Parking Garage) On The Grounds Of The Schwabing Clinic (Building Site House 77). 2. Objectives Of The Planning The Subject Of The Tendered Planning Services Is The Specialist Structural Planning For The New Construction Of A Three-Part Building Complex Consisting Of A Parents House, A Farm Yard Including A Central Energy Supply And A Parking Garage On The Grounds Of The Schwabing Clinic (Building Site House 77). The Project Includes Several Components: - Parental Home (Eh): New Building For Families Of Seriously Ill Children. Planning From Lp 5, Construction And Financing Are Carried Out By The We Help Munich Foundation Using Donations. The Contractors Services Up To And Including Lp 4 Are Therefore Handed Over To The Foundation For Further Processing And Implementation. - Wirtschaftshof (Wh): Centralization Of Economic Functions Including Tunnel Passage And Central Energy Supply. Contractors Services Gradually Up To Lp 6. - Parking Garage (Ph): Split-Level Construction, Open Facade, 198 Parking Spaces. Charging Station Concept Must Be Taken Into Account. Contractors Services In Stages Up To Lp 6. - Construction Pit/Shoring: Uniform For All Three Buildings In Advance. Engineering Services For Shoring Are Awarded Separately (Not The Contractors Work). Special Planning Requirements/Framework Conditions For The Contractors Services: - Bored Piles: Approximately 40 Bored Piles (Depth Approx. 8 M) As Well As The Floor Slab Of The Former Stairwell (House 77) Currently Remain In The Construction Site; These Must Be Dismantled As Part Of A Preliminary Measure. - Hades: The Existing Underground Canal (Hades) Must Be Dismantled And Secured In Some Areas. The Media Running In Hades Also Needs To Be Relocated. - Construction Pit Interface: These Measures Must Be Completed Before The Actual Excavation Of The Earth And The Start Of Construction Of The Construction Pit (Foundation). - Monument Protection (Ensemble Protection), To Be Taken Into Account By The Contractor; - Participation In Obtaining Building Permits For All Three Parts Of The Project By The Contractor, - Receipt Of Nea, - Relocation Of Media Tunnel. Gradual Commissioning: - Eh Only Up To Lph 4 (Then Handover To Foundation, Which Will Commission Vrs. Gü With Lp 5 And Implementation), - Wh+Ph Up To Lph 6 In Stages; Levels: Lph 1-2, If Still Required Based On Feasibility Study, 3-4 / 5 / 6. Special Services According To The Service Description, See Above And Also, Appendix 1Service Description Not Subject: - Planning Excavation/Shoring, Object Planning Buildings And Open Spaces, Specialist Planning Hlsk, Elt, (Each Separate Specialist Planner). Estimated Gross Costs Including Nk: Eh Approx. 10 Million, Ph Approx. 7.57 Million, Wh Approx. 7.23 Million. Total Approx. 25 Million Eur. Dates: - Start Of Construction Pit No Later Than October 1St, 2026, - Start Of Construction Eh 01/2027, - Completion Eh Q4/2028, - Completion Wh 06/2028, - Completion Ph 03/2029. 3. Estimated Total Construction Costs (Total Ewp) The Stated Total Construction Costs Were Taken From Specific Key Figures
Contact Information
Address
Thalkirchner Straße 48
Contact No.
+49 89 6794 2259
Email
judit.derdak@muenchen-klinik.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110950102
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.