Construction Work For Research Buildings – Trockenbauarbeiten. Build Drywall And Suspended Ceilings In Multiple Sections. First, As An Advance Payment For The Technical Building Equipment, The Corridor Walls Must Be Built On One Side And The Shaft Walls, In Partial Areas, In Sections, Room By Room. At A Later Date, The Remaining Room Walls, Facing Shells And Suspended Plaster Ceilings Will Be Installed And, After The Screed Work, The Acoustic And Metal Ceilings Will Be Installed. A Wide Variety Of Requirements For Sound Insulation, Fire Protection And Room Acoustics Must Be Met. 3155 M2 Metal Stud Walls; 536 M2 Metal Stand Facing Shells; 170 M2 Shaft Walls, 350 M2 Gk Ceiling; 615M2 Gk Ceiling With Round Holes; 922 M2 Metal Element Ceilings; 275 M2 Wooden Slatted Ceiling; 4 Pcs. Ei30-Trav Windows, 2 Pcs. Ei30 Windows; 2 Pieces F0 Windows Including Factory & Assembly Planning
Contact Information
Contact No.
+49 8677 96769-0
Email
wirtschaft@burghausen.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110925607
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.