|
Construction Work – Westfalenpark, Redesign Of The Central Square - Shell Construction. Title 01.02 Superior Services Item 01.02.4 Core Drilling Concrete, Diam. 100-150 Mm, D 20-25 Cm: 6,000 Pieces Item 01.02.6 Electrical Installation Pipe Pe-Hd Ad 20 Mm In Concrete: 150,000 M Item 01.02.7 Water Pressure Leak Test: 3,000 Pieces Title 01.03 Construction Site Equipment Item 01.03.2 Stationary Tower Crane: 2,000 St Pos. 01.03.22 Maintain Construction Fence H 2 M: 40,800,000 Mwo Pos. 01.03.23 Clear Construction Fence H 2 M: 680,000 M Pos. 01.03.11 Dewatering, Open, Day Water: 1,000 Psch Title 01.05 Technical Center Area 01.05.01 Foundation Work Foundation Item 01.05.01.10 In-Situ Concrete Floor Slab Reinforced Concrete C30/37, Wu, D 25-50 Cm: 57,000 M3 Item 01.05.01.15 Perimeter Insulation Floor Slab Underside, 2-Layer, D 160 Mm: 189,000 M2 Item 01.05.01.18 Perimeter Insulation Outer Cellar Wall, D 160 Mm: 105,000 M2 Area 01.05.02 Masonry Work Pos. 01.05.02.23 Masonry External Wall Ks, D 24 Cm: 140,000 M2 Pos. 01.05.02.4 Masonry Partition, Non-Load-Bearing Ks, D 11.5 Cm: 84,000 M2 Pos. 01.05.02.21 Compensating Edge Layer Wall Base Ks, D 24 Cm: 42,100 M Area 01.05.03 Reinforced Concrete Work Item 01.05.03.1 In-Situ Concrete Outer Wall Reinforced Concrete C30/37, Wu, D 25-40 Cm: 59,000 M3 Item 01.05.03.3 Formwork Outer Wall Sb2, H 2-3 M: 197,000 M2 Pos. 01.05.03.18 In-Situ Concrete Ceiling Slab Reinforced Concrete C30/37, Sb2, D 18-25 Cm: 47,000 M3 Pos. 01.05.03.16 Formwork Ceiling Slab Storage: 189,000 M2 Area 01.05.04 Prefabricated Parts Pos. 01.05.04.3 Rectangular Support Prefabricated Part: 22,250 M Item 01.05.04.5 Thermal Insulation Element (Component Height Approx. 160 Mm): 22,000 Pieces Item 01.05.04.4 Angle Support Element: 2,590 M Area 01.05.05 Reinforcing Steel Item 01.05.05.1 Reinforcing Steel Mesh B500s: 15,472 T Item 01.05.05.2 Reinforcing Steel Mesh B500m: 9,080 T Sub-Area 01.05.06.01 Underground Pipes Item 01.05.06.01.3 Kg Pipe Dn 110: 60,000 M Item 01.05.06.01.5 Kg Elbow 45° Dn 110: 36,000 St. Subarea 01.05.06.02 House Introductions Item 01.05.06.02.1 Multi-Part House Entry (Basement): 3,000 St Item 01.05.06.02.2 Single-Part House Entry (Basement): 2,000 St Pos. 01.05.06.02.3 House Entry (Without Basement): 1,000 Pcs. Sub-Area 01.05.06.03 Backflow Valve, Technical Center Item. 01.05.06.03.1 Backflow Valve, Swa Dn 100, Exposed: 1,000 Pcs. Title 01.06 Bird Aviary Area 01.06.01 Foundation Work, Foundation Item. 01.06.01.17 In-Situ Concrete Floor Slab Reinforced Concrete C25/30, D 25-50 Cm: 27,300 M3 Item 01.06.01.18 Formwork Floor Slab, Single-Sided H 25-50 Cm: 50,200 M Item 01.06.01.15 Formwork Strip Foundation H 0.5-1.0 M: 47,400 M2 Area 01.06.02 Masonry Work Item 01.06.02.23 Masonry Outer Wall Ks, D 17.5-24 Cm: 198,800 M2 Item 01.06.02.14 Masonry Inner Wall Ks, D 24 Cm: 32,800 M2 Item 01.06.02.31 Cover The Opening Ks Lintel Supporting External Wall: 21,100 M Area 01.06.03 Reinforced Concrete Work Pos. 01.06.03.2 Formwork External Wall Sb2: 94,100 M2 Pos. 01.06.03.26 Formwork Supporting Wall: 112,300 M2 Pos. 01.06.03.11 Formwork Ceiling Slab Storage: 86,400 M2 Area 01.06.04 Reinforcing Steel Item 01.06.04.2 Reinforcing Steel Mesh B500m: 5,227 T Item 01.06.04
|