Architectural, Construction, Engineering And Inspection Services – Replacement Of The Herbrum Lock - Procurement Package 1: General Planning. The Project Goal According To The Approved Preliminary Investigation And Approved E-Hu Planning Is To Replace The Operating, Left (Western) Lock Chamber Of The Herbrum Lock In The Dortmund-Ems Canal (Dek) To Ensure The Long-Term Safety And Ease Of Shipping As Well As The Performance Of The Federal Waterway. The New Lock Chamber Should Go Into Operation Before The Western Lock Chamber Is Decommissioned (Remaining Useful Life Approx. 15 Years) And Its Dimensions And Performance Should Be Adapted To Current And Future Requirements. The Replacement Of The Herbum Lock Will Be Carried Out At The Location Of The Old, Eastern Lock Chamber After It Has Been Dismantled. The Commissioning/Opening To Traffic Of The New Lock Is Planned For Q2 2032. The Contractor Of Award Package 1 (Vp1) Assumes Overall Responsibility For The Integrated Object And Specialist Planning Of The New Lock System, Including All Construction Stages, As Well As The Overarching Planning Integration And Coordination In The Integrated Planning Phase Of The Alliance. Vp1 Ensures That All Specialist Contributions Are Brought Together Into An Integrated Overall Planning Status In A Consistent, Approvable And Reliable Manner For Determining The Target Price And That The Planning Reflects The Functional Requirements, Project Goals And Technical Boundary Conditions Completely And Verifiably. In Addition, Vp1 Is Responsible For The Content Coordination Of Those Involved In The Planning, The Structured Integration Of The Construction Award Packages (Vp2 And Vp3) Into The Planning, As Well As The Moderation And Documentation Of Planning-Relevant Decisions In The Spirit Of The “Best For Project” Approach. Responsible Services: Vp1 Provides The Following Services In Particular: - Complete Object And Specialist Planning Of The Lock System Including All Hydraulic Engineering, (Earth And Civil Engineering), Hydraulic Steel Engineering, Solid Construction, Mechanical And Electrical Engineering As Well As Emsr Technical Planning Components Up To The Planning Status That Is Approved And Suitable For The Target Price Determination And Implementation Preparation, - Integrated Development Of The Entire System Including Building And System Concepts, Chamber Walls And Areas, Base, Heads, Portals, Guides, Auxiliary Structures, Hydraulic Steel Construction, Mechanical, (Machine) Hydraulic, Electrical, Control And Instrumentation Systems As Well As Traffic, Operating And Auxiliary Systems, - Design, Approval And Implementation Planning Of Path Infrastructure - Development Of Test And Acceptance Plans, - Creation Of All Required Specialist Models, Evidence, Calculations And Measurements, - Planning Of All Construction Stages, Intermediate Construction States And Temporary Arrangements Including Construction Pits, Construction Pit Protection, Construction Processes, Traffic And Shipping Management During Construction As Well As Measures To Ensure The Operational Security Of The Existing Systems, - Integration Of The Requirements From Operational Security, Flood Protection, Shipping, Etc
|