|
The Subject Of The Order Is The Execution Of: 1) Connection And Installation Of A Storm Sewage System, 2) Installation Of Retention Tanks, 3) Perimeter Drainage Of The Building, 4) Reconstruction Of The Surface, 5) Electrical Installation For Powering The Pumps. In Addition, Renovation And Replacement Of The Moisture-Proof And Thermal Insulation Of The Basements Is Planned. The Detailed Scope Of Works To Be Performed Is Described In The Attached Design Documentation And Stwior. The Ordering Party Specifies Below The Activities Related To The Execution Of The Order By Persons Employed By The Contractor Or Subcontractor Under An Employment Contract, In The Circumstances Referred To In Art. 95 Of The Act: - Dismantling The Hardened Surface Made Of Concrete Cubes, - Excavation With Reinforcement, - Dismantling Existing Sewage Wells And Sewage Pipes, - Removing The Resulting Debris, - Securing Existing Utilities And Installing Protective Pipes, - Making Temporary Control Ditches, - Drilling, - Connecting An Existing Well To A Rainwater Canal, - Building Up The Well, - Installing Linear Drainage, - Installing Point Drainage, - Connection Of Drains, – Laying Of Gravity Sewage Pipes, – Construction Of A Foundation Slab, – Installation Of Retention Tanks, – Installation Of Pipe Connections, – Installation Of A Coalescing Separator, – Installation Of Sewage Wells, – Installation Of Manholes, – Installation Of An Outflow Regulator, – Installation Of A Non-Return Flap At The Outlet Of The Pipe To The Manhole, – Installation Of A Storm Flap In The Manhole, – Installation Of Storm Drains On Reinforced Concrete Slabs, – Installation Of Sedimentation Tanks Downpipes, – Tightness Tests Of The Completed Reinforcement, – Backfilling And Compaction Of Excavations, – Restoration Of The Surface: Earth, Hardened With Concrete Cubes, – Laying Drainage Pipes In The Filtration Backfill, – Laying Sewage Pipes, – Laying Pressure Pipes, – Installation Of Drainage Wells, – Installation Of Expansion Wells, – Installation Of A Sewage Well, – Installation Of Dirty Water Pumps And Their Activation, – Installation Of Drains In Existing Basement Skylights, – Dismantling The Existing Insulation, – Removing Damaged And Cracked Plasters Along With Dismantling The Existing Insulation And Cleaning The Surfaces, – Filling In The Plaster Surface, Defects And Gaps, Priming The Wall Surfaces, – Installing Moisture-Proof Insulation Of The Walls, – Insulating The Walls, – Installing A Reinforced Protective Layer, – Restoring The Finishing Layer (Plinth Strip), – Installing Dimpled Foil, – Sealing The Buildings Expansion Joints, – Connection To The Existing Well, – Installation Of An Anti-Flood Check Valve In The Well, – Power Supply To The Pumping Station With Protection. In Relation To Contractors Based Outside Poland, The Ordering Party Allows The Employment Of Employees On The Basis Of Equivalent Legal Regulations Of The Home Country.
|