The Municipality Of Sodankylä Is Requesting A Bid For The Overall Design Of The Renovation And Expansion Project Of The Siltaharju Fish Hall (Siltaharjuntie 133, 99600 Sodankylä) In Accordance With The Tender Documents: Scope Of The Requested Design Work: Task Sets According To Rt Card 103253 (Architectural Planning Task List Ark18) Rt Cards 103087 (Rak18) And 10-11290 (Tate18) Task Sets From General Design To Warranty Period Tasks. For Other Design Areas, In A Similar Scope. The Building Must Meet The Requirements Of The Food Production Facility. Coordination-Implementation Plans: Foundations, Sections, Facades, Details And Material Specifications-Determination Of Repairs To The Interior And Exterior Surface Materials Of The Current Building-Bim Planning-Design Support And Refinements For The Work Phase-Documentation Of Plans And Handover Materials-Surface Leveling And Stormwater Plan (Customer Supplies A Terrain Model)Structural Planning-Definition Of Initial Data And Design Bases-Load-Bearing Structures Dimensioning And Selection Of Structural Solutions-Preparation Of Structural Plans (Bases, Frames, Joints, Foundations)-Building Physical Inspections (Heat, Humidity, Sound Insulation If Necessary)-Information Modeling (Bim) And Model-Specific Specifications Of Structures-Detailed Drawings-Coordination Of Planning With Architectural And Building Engineering Planning-Planning Support During The Work Phase And Specifications Related To Structures-Detailed Drawings, Delivery Material And Production Of Documentation Hvac Design - Ventilation For Processing Facilities, Cold And Social Facilities - Ventilation System Suitable For Hygiene Requirements - Cooling And Humidity Management - Water, Sewer And Floor Well Systems (Take Into Account Machines In The Premises) As Well As The Necessary Changes To The Waste Water System Plans Made In 2021, The Known Problems Are That The Mud Tank Drains Freeze And The Mud Tank Is Placed In Front Of The Incoming Fish Door, Which Is Hygiene Risk.-Property Water And Sewage System-Hvac Systems Coordination With Refrigeration Equipment-For The Expansion Part Of The Compressed Air System Of The Treatment Facilities (According To The Current Treatment Facilities)-Heating Systemelectrical Design-Electricity Distribution And Object Centers-Production And Cold Room Lighting (Ip Classifications)-Sockets And Machine Power Supplies-Camera System (Poe ++) The Customer Defines The Switches And Cameras.-Connections For Refrigeration Machines And Automation-Compatibility Of The Current Solar Panel System Automation Design-Building Automation System-Refrigeration System Alarms And Monitoring-Data Collection And Remote Monitoring-Integrations To Hvac And Electrical Systems Refrigeration Equipment Design-Refrigeration Machines And Compressors-Refrigeration Pipelines And Refrigerant Networks-Refrigeration And Freezer Rooms In Storage Facilities-Process Refrigeration (Filleting, Packaging, Pretreatment)-Management Of Condensate Water-Plant Diagrams And Dimensioning Calculations-Condenser And Machine Room Ventilation-Refrigerant Leakage Management, Alarms And Safety Devices-Environmental And F-Gas Requirements Taken Into Account The Tenderer Prepares The Necessary Drawings And Competition Material For The Construction Permit, As Well As A Cost Estimate.Comparison Requirement For The Complete Set Of Heating, Ventilation And Refrigeration Equipment Solutions The Customer Decides The Equipment Solutions After The Comparison Is Completed.Electricity (Current Heating) Comparisons Of Heating And Cooling Solutions Air/Water Heat Pump Geothermal Heat (Considering Ground Cooling) It Is Also Possible To Install The Collector Circuit In A Water Body. Preliminary Permission Has Been Requested From Kemijoki Oy. Hybrid Systems Other Energy-Efficient Solutions Required In The Comparison: Energy Consumption (Kwh/A) Investment Costs Life Cycle Costs In 20–30 Years Suitability For Production Facilities And Environmental Requirements Option 1. Expansion Of The Warehouse Building Based On The Floor Plan Sketch, Architectural, Structural And Hvac Design Purpose Of Use: Toilet, Washroom And Chemical Toilet Emptying Functional Requirements:-Interior Surfaces Are Durable And Easy To Clean, E.G. With A Pressure Washer-Water, Sewer And Floor Drain Systems-Electricity-Mud Tank And Absorption Of Gray Water Or Connection To The Fish Halls Waste Water System-Possibility Of Electrically Operated Locks, For Opening Doors By E.G. Text Message-Preparation Of A Cost Estimate Target Schedule:- Planning Can Start On May 4, 2026- Planning And Bidding Materials Must Be Ready On Friday 15/06/2026
Contact Information
Address
Jäämerentie 1 Pl60
Contact No.
+358405027505
Email
petri.sassali@sodankyla.fi
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110910216
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.