The Subject Of This Public Procurement Is: Construction Supervision Of A Site: Continuation Of Minko Radkovski Street To Mbal, In The Town Of Troyan The Subject Of This Order Includes The Exercise Of Construction Supervision Of The Smr, The Performance Of The Functions Of The Safety And Health Coordinator For The Construction Stage In Accordance With Art. 5, Para. 3 Of Ordinance No. 2/2004 On Minimum Requirements For Health And Safety At Work During Construction Works And The Preparation Of A Final Report In Accordance With Art. 168, Para. 6 Of The Zut, For The Issuance Of A Certificate For Putting The Facility Into Operation, Including The Preparation Of Technical Construction Passport, According To Ordinance No. 5 Of 2006 On Construction Technical Passports. The Scope Of The Order Includes The Exercise Of Construction Supervision During Construction Within The Mandatory Scope Regulated In The Zut And The By-Laws On Its Implementation. The Project Covers The Continuation Of Minko Radkovski Street And The Formation Of A T-Junction At Ot 976 Connecting The Street With Professor Shipkovenski Street And Thirty-Fourth Trojan Regiment Street. In Order To Improve The Operational Condition, A Roadway And Pavements Should Be Built, A Sewage System For Draining The Rainwater Discharged Into The Collector Of The Alditsa Gully And Lighting Of The Section Under Consideration. Currently, Minko Radkovski Street Is Built Next To O.T. 975, 50 Meters After The Newly Built Parking Lot At The Polyclinic. Professor Shipkovenski Street Is Designated Next To O.T. 997, At The Entrance To The Medical Center - Troyan. According To Information Presented By The Contractor And The General Development Plan Of The Municipality Of Troyan, Minko Radkovski Street And Professor Shipkovenski Street Are Part Of The Secondary Street Network, With The Geometrical Elements Being Closest To Class Vi For Design Speed Vpr=30 Km/H. The Geometric Axis Of The Project Axes Is Guided By Regulation, The Axial Length Of The Routes By Streets Is As Follows: Along Minko Radkovski Street 74.00 M, After Discharge At A Four-Way Intersection, Along Chernogor Street With A Length Of 18.80 M And Along Professor Shipkovenski Street Is 164.05 M. The Activities Will Be Carried Out By The Contractor For The Entire Construction Period Of The Object, Including The Time Until The Date Of Issuance Of The Certificate For Putting The Object Into Operation. The Term For Exercising Construction Supervision Starts From The Date Of Signing The Protocol For The Opening Of A Construction Site And Determination Of The Construction Line And Level (Sample Act No. 2 According To Ordinance No. 3 Of 31.07.2003 For Drawing Up Acts And Protocols During Construction) For The Object And Ends With The Issuance Of The Certificate For Putting The Object Into Operation. The Term For The Execution Of The Order Must Be In Accordance With The Period For The Execution Of The Construction Activities For The Relevant Object - Up To 365 Calendar Days. Construction Category - Iv Category, According To Art. 137, Para. 1, Item 4 Of Zut. Full Information On The Scope, Volume And Technical Requirements For The Execution Of The Public Procurement Is Described And Regulated In The Technical Specification, An Integral Part Of The Participation Documentation.
Contact Information
Contact Person
Гълъбина Гошева Пенкова
Email
gpenkova@troyan.bg
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110909619
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.