|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af03/2022Ps, Galvanized Steel Work Signage Sign, Manual Cleaning Of Vegetation On The Ground With A Hoe. Af03/2024, Siding With Metallic Tile. Af03/2024, Electricity Input, Overhead, Three-Phase, With Overhead Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Concrete Post Not Included). Af12/2025, 03/24/2026 - 09:33:04, 03/24/2026 - 09:33:08, Temporary Water And Sanitary Connection, Warehouse Shed With An Area Of 10.90M2, 12Mm Plywood Sheet And 8X8cm Spike, Cemented Floor And Roof 6Mm Fiber Cement Tiles, Incl. Point Of Light, Conf. Project (1 Use), Warehouse And/Or Office And/Or Closed Deposit, Junior Civil Engineer With Additional Charges, General Foreman With Additional Charges, Appointor Or Appropriator With Additional Charges, Day Watchman With Additional Charges, Removal Of Remaining Tree Trunk Roots With A Diameter Greater Or Equal To 0.20 M And Less Than 0.40 M. Af03/2024, 40 M And Less Than 0.60 M. Af03/2024, Demolition Of Plaster, Total Plastering With Tips/Chisels, Latex Paint Removal (Scraping And/Or Sanding And/Or Brushing), Concrete Demolition By Hand, Demolition Of Block Masonry Drilled, Manually, No Reuse. Af09/2023, Demolition Of Structural Concrete Block Masonry - With Coating, Demolition Of Reinforced Concrete Pillars And Beams, Removal Of Pre-Molded Concrete Box For Air Conditioning, Removal Of Granite (Or Marble) Partition, Demolition Of Ceramic Coating, Demolition Of Ceramic Floor Or Tile, Removal Of Gutters And Flashings, Removal Of Drywall, Pvc And Fibromineral Linings, Removal Of Plaster Lining, Removal Of Metallic And Ceramic Fiber-Cement Tiles, Removal Of Wood (Lath And Lath) On Roofs With Ceramic Tile, Demolition Of Wood In Roofs With Fiber-Cement Tiles 4 To 8 Mm, Removal Of Wood, Exclusive Parts Main, Removal Of Doors, Removal Of Windows, Removal Of Metallic Door/Gate, Removal And Relocation Of Iron Frame, Removal Of Galvanized Wire Mesh From Fences For Multi-Sport Courts, Without Removing The Supporting Structure, Removal Of Fences For Multi-Sport Courts, Structured By Galvanized Steel Tubes, With Screen Of Galvanized Wire, Removal Of Granite (Or Marble) Countertops, Removal Of Stainless Steel Sink Top Comp: 1.20M, Removal Of Crockery, Removal Of Cold Water Pipes (Tubes And Connections), Removal Of Electrical Cables, With Sections Greater Than 2.5 Mm² And Smaller Than 10 Mm², Removal Of Switches/Sockets Electrical, Removal Of Lighting Fixtures, Removal Of Embedded Or Above-Mounted Electrical Panel, Transport With Truck Body With Crane (Munck), Maximum Loading Moment 11. 7 Tm, On Paved Urban Road, Dmt Up To 30Km (Unit: Txkm). Af07/2020, Transport With 14 M³ Dump Truck, Dmt Up To 30 Km (Unit: Txkm). Af07/2020, Loading, Maneuvering And Unloading Soil And Granular Materials In A 14 M³ Dump Truck - Loading With Loader (Bucket From 1.7 To 2.8 M³ / 128 Hp) And Free Unloading (Unit: M3). Af07/2020, Wheeled Backhoe Loader With Loader, 4X4 Traction, Net Power. 88 Hp, Loading Bucket. Min Cap. 1 M3, Retro Bucket Cap. 0.26 M3, Min Operating Weight 6,674 Kg, Max Digging Depth 4.37 M - Daytime Chp. Af06/2014, 14 M3 Dump Truck, With Capacity Mechanical Horse
|