Pd Processing, Supply And Installation Of A Renewable Source Of Electricity - A Photovoltaic Power Plant (Pve) With A Minimum Total Output Of Pv Panels: 520.95 Kwp And An Accumulation Of 209.38 Kwh According To The Construction Technology Solution Studies Listed In Appendix No. 6 Of This Zd (Hereinafter Referred To As The Study). The Contracting Authority Stipulates That The Supplier May Deviate From The Technical Solution If The Conditions Of The Subsidy Provider Of The State Environmental Fund Are Respected (See Https://Www.Sfzp.Cz/Dotace-A-Pujcky/Modernizacni-Fond/Vyzvy/Detail-Vyzvy/?Id=9) And The Overall Performance Of The Proposed Solution Is Increased. The Public Contract Is Not Divided Into Parts; This Is A Repetition Of One Of The Parts Of The Contract That Was Not Completed, Namely Part 2) 520.95 Kwp And Accumulation Of 209.38 Kwh.
Contact Information
Address
Mírové náměstí15/741201Litoměřice
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110861110
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.