|
Pipeline-Design Services - Examination Of Bore Wells, Preparation Of Investment Project And Exercise Of Author Supervision For Site: Mutnitsa Water Supply System, Shumen Municipality. The Subject Of The Order: Examination Of Bore Wells, Preparation Of An Investment Project And Exercise Of Authors Supervision For The Object: Mutnica Water Supply System, Shumen Municipality, On The Basis Of Article 52, Paragraph 1, Item 4 And Article 44, Paragraph 1, In Connection With Article 60 Of The Law On Water And Ordinance No. 1 For The Exploration, Use And Protection Of Underground Water, A Procedure For Issuing A Permit For Water Abstraction From Underground Water Facilities, Includes The Following Activities: Activity 1 - Survey Of Boreholes (R-1, R-1A, R-2, R-4, R-7 And R-8) From The Water Supply System Mutnitsa, Municipality Shumen - Survey 6 Pcs. Drilling Wells; Activity 2 - Preparation Of An Investment Project In The Technical Design Phase For Putting Into Operation Drilling Wells (R-1, R-1A, R-2, R-4, R-7 And R-8) From The Water Supply System Mutnitsa, Shumen Municipality - Preparation Of A Technical Investment Project For 6 No. Drilling Wells; Activity 3 - Preparation Of A Proposal To Amend The Permit For Water Abstraction No. 21510165/17.09.2010 Through An Existing Water Abstraction Facility In The Basin Directorate Black Sea Region (Bdcr) From Drilling Wells (R-1, R-1A, R-2, R-4, R-7 And R-8) From The Water Supply System Mutnitsa, Shumen Municipality – 1 Pc.; Activity 4 – Exercising Copyright Supervision Under Art. 162 Of The Law On Territorial Planning (Zut) For The Entire Period From The Date Of Signing The Protocol For Opening A Construction Site And For Determining The Construction Line And Level (Appendices No. 2 And 2A) Until The Drawing Up Of The Last Act Of Ascertainment, Model Appendix No. 15 Of Ordinance No. 3 Of July 31, 2003 For The Drawing Up Of Acts And Protocols During Construction Or, When Remarks Are Identified In It, Until The Signing Of The Last Protocol For Acceptance By The Contracting Authority Of The Object Without Remarks - For 6 Pcs. Drilling Wells. All Activities, Objects And Requirements Of The Contracting Authority For The Implementation Of The Public Procurement Are Described In Detail In The Technical Specification, An Integral Part Of The Documentation For This Public Procurement.
|