|
1. The Subject Of The Order Is: Modernization Of The Orlik Sports Complex In Oborniki.2. Demolition Works: - Disassembly Of Lighting Fixtures, - Dismantling Of Existing Goals, - Dismantling Of Basket Boards With Rings, - Dismantling Of The Ball Catcher Net With Lines, Fasteners And Tensions, - Removal Of Synthetic Grass With Filling And Delivery To The Investors Warehouse, - Removal And Disposal Of Demolition Materials.3. Renovation Of A Football Pitch: A) Dimensions Of The Pitch: B) Scope Of Renovation Works - Playing Field Covered With Synthetic Grass - Home Field - 26 X 56 M, - Outfield On Artificial Grass, 2 M Wide On The Long Side And 3 M Behind The Goals, - Total Area Of The Artificial Grass Surface Is 30 X 62 M = 1,860.00 M2. C) Scope Of Renovation Works - Replacement Of The Grass Surface Synthetic, - Replacement Of Football Goals And Ball Nets, - The Level Of The Pitch Surface Will Correspond To The Existing Level Of The Pitch And The Existing Surroundings, - The New Surface Is Synthetic Grass Filled With Cork, The Existing Substructure And The Edges Of The Pitch Will Be Preserved, - It Is Planned To Supplement The Upper Subbase Layer With Stone Material Fraction 0-5 Mm On The Entire Pitch Surface And Level, Profile And Compact The Subbase Layers.4. Renovation Of The Multi-Purpose Pitch: A) Dimensions Of The Pitch: - Playing Field Covered With A Polyurethane Surface - Main Board - 20 X 40 M, - Outfield On Artificial Grass, 5 M Wide On The Long Side And 5 M Behind The Goals, - Total Polyurethane Surface 30 X 50 M = 1,500.00 M2. B) Scope Of Renovation Works: - Washing The Pitch Surface With A High-Pressure Washer, - Checking Defects And Cracks In The Pitch Surface, - Repair Of Defects And Cracks, - Impregnation Of The Entire Pitch Surface, The So-Called Primer For Polyurethane Surfaces, - Spraying A 3 Mm Epdm Layer In Red, - Marking And Painting Lines Marking The Playing Field - A Handball Court In White And Two Basketball Courts In Yellow.5. The Renovation Of The Pitch Also Includes The Replacement Of Sports Infrastructure Elements, Such As Football Goals, Handball Goals, Basketball Hoops, Net Catches, And Renovation Of The Pitch Lighting. Attention! The Works Will Take Place On The Premises Of An Existing Educational Institution, In The Immediate Vicinity Of Dense Multi-Family Housing Developments And On Roads With Quite Heavy Vehicle Traffic - Organize The Works Carefully, Maintaining The Safety Of School Users And Residents (Securing The Construction Site And Transport Route, E.G. Fencing, Security, Etc.). In The Case Of Transport Of Building Materials By Vehicles With A Tonnage Above 3.5T, The Contractor Will Be Obliged To Obtain, Through Its Own Efforts, The Consent Of The Relevant Public Road Managers. Due To The Co-Financing Of The Task, The Contractor Will Be Obliged To Make An Information Board With Dimensions Of 180 × 120 Cm. The Information Board Template Is Attached To This Description. More Information: Https://Www.Gov.Pl/Web/
|