|
The Subject Of The Order Is The Performance Of Construction Works As Part Of The Task Entitled: Modernization Of The Roof In The Building Of The Social Welfare Home In Matczyn. The Scope Of Implementation Will Include, Among Others: The Following Works: 1) Dismantling Of The Existing Lightning Protection System, 2) Dismantling Of The Existing Metal Roof Tile Covering With Protection, 3) Dismantling Of The Existing Old Roof Windows And Roof Hatches, Snow Guards, Ridge Tiles, 4) Dismantling Of Flashings On The Gutter Strips, Under The Gutters, Firewalls, Chimneys, Valley Gutters, Wind Girders, 5) Dismantling Of The Batten Roof Covering And Roof Formwork,6) Disassembly Of The Existing Old Reinforced Windproofing Foil,7) Dismantling Of The Existing Gutter System,8) Comprehensive Implementation Of New Treatments And All Necessary Finishes, Including Gutter Strips, Under-Gutter Strips, Firewalls, Chimneys, Valley Gutters, Wind Braces,9) Installation Of New Counter Battens And Battens,10) Installation Of A Highly Vapor-Permeable Windproofing Membrane Made Of Gluing The Overlaps,11) Covering The Roof With Metal Tiles Using System Elements,12) Installing Snow Protection,13) Installing A Lightning Protection System,14) Installing Roof Windows With Flashings According To The Diagram With The Reconstruction Of The Internal Finish In The Rooms,15) Installing Chimney Grates,16) Installing System Roof Chimneys,17) Installing A New Gutter System According To The Diagram,18) Installing New Roof Hatches With Collars. A Detailed Description Of The Subject Of The Order Can Be Found In Annex No. 1 To The Swz, Which Consists Of The Following Documents: − Design Documentation, − Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb), − Bill Of Quantities. Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Lump Sum, When Pricing The Offer, The Contractor Should Rely On The Scope Indicated In The Design Documentation. The Bill Of Quantities Is Of An Auxiliary Nature. The Occurrence, During The Implementation Of The Contract, Of Works Not Included In The Bill Of Quantities Or Of Works In A Larger Quantity Compared To The Quantity Accepted In The Bill Of Quantities Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Design Documentation. Amount Intended To Finance The Order - Pln 1,800,000. Names And Cpv Codes Specified In The Common Procurement Vocabulary: 45000000 Construction Works, 45110000-1 Demolition Works, 45262000-1 Insulation Works, 45261000-4 Carpentry Works, 45261000 - 4 Roofing Works, 45312310-3 Lightning Protection Works. The Ordering Party Pays Particular Attention To The Possibility And Advisability Of Making A Local Inspection Of The Place Of Planned Works Before Submitting The Offer. The On-Site Visit Can Be Carried Out From Monday To Friday From 8.00 A.M. To 2.00 P.M. After Prior Arrangement Of The Date By Calling: 81/517 22 61 Ext. 66 (A
|