Registration For Relocation Of Interferences, Pre-Hole For Rotary Drilling In Rock, Mechanized Auger Drilling, Geological And Geotechnical Studies For Paving Project, Mobilization And Demobilization Of Rotary Drilling Team And Equipment, Including Travel To Greater Vitória, 03/20/2026 - 17:38:41, 03/20/2026 - 17:38:44, 03/20/2026 - 17:38:46, 03/20/2026 - 17:38:48, Mobilization And Demobilization Of Spt Survey Team And Equipment, Spt Percussion Survey - Casing Pipe Installation, Spt Simple Type Recognition Survey, Incl. Local Displacement Of Equipment Up To 500 M, Rotational Probing In Rock Alteration Including Local Displacement Of Equipment Up To 500 M, Rotational Probing In Sound Or Fractured Rock Including Local Displacement Of Equipment Up To 500M, Rotary Probing In Soil, Including Local Displacement Of Equipment Up To 500M, Displacement Between Holes In The Spt Probing Investigation Area Above 500 M Distance, Mobilization Of Floating/Palisade For Rotary Surveying, Mobilization Of Floating/Palisade For Spt Surveying, Manual Movement Between Holes For Rotary Surveying Above 500 M, Implementation Of Mooring Polygon In Concrete Marcos, Maximum Spacing 500 M, With Geometric Leveling, Including Post Processing, Implementation Of Base (Pair Of Landmarks) Of Concrete, Georeferenced With Dual Frequency Gps, Cadastral Planialtimetric Survey In Wavy Region (100 Points/Ha), Bathymetric Survey In Watercourse With Conventional Topography And Sections, Aerophotogrammetric Survey With Drone, Hydrological Studies For Macrodrainage Projects, Ebap Hydromechanical Project, Ebap Foundation And Structural Project, Project Electrical, Automation, Instrumentation, Spda, Structured Network For Data And Voice, Cctv Ebap, Dimensioning Of The Geometry Of The Bus Body, Dimensioning Of The Reservoir And Dimensioning Of Extravator Structures, Bus Geometry Project, Project Of Devices And Hydraulic Structures, Executive Project Of Land Studies, Plumbing Project In: Galleries, Concrete Walls, Gabion And/Or Similar, , Project Of Special Art Works (Bridges And Viaducts) In Reinforced And/Or Prestressed Concrete, Mixed Steel Structure (Steel/Concrete), Except Foundation (1000M³), Foundation Project For Special Art Works - Bridges, Viaducts And Walkways - In Deep Foundation (For 1000 M²), Elementary Geotechnical Report, Floristic Study, According To Tr Iema, Rca - Environmental Control Report For Plumbing Works, Single Lane Earthworks Project In An Urban Area, Drainage And Oac Project For Highways In A Single Lane In An Urban Area, Highway Signing Project In A Single Lane In An Urban Area, Highway Paving Project In A Single Lane In An Urban Area, Complementary Works Project On Highways, Hydrological Studies For The Implementation Project Of Highways, Processing And Consolidation Of Information Gathered In Products 1 And 2 Regarding Topographic, Geotechnical And Hydrological Studies., Expropriation Project, Involving Creation Of Records And Social Service Approach), Collection Of Documentation, Inspection And Preparation Of Valuation Report (Per Unit), Detailed Presentation Of The Most Feasible Techniques To Encourage Development And Public Use In A Form Order Of Areas Throughout The Basin. Comprises Future Intervention Activities Of Urbanization, Accessibility, Paving
|