|
Daily Rate To Attend A Day Of Event Such As Meetings, Lectures, Etc., In Accordance With The Minimum Specifications: Slin Kit, 2 Boxes With 8 Speakers Of 5 And 2 Drive At Home Box, 2 Sub 18, 1 Digital Table 32 Channels, 4 Active Monitors 1X12, 1 Battery Microphone Kit, 5 Microphone With 58 Wire, 2 Microphone Without Wire, 5 Passive Direct Box, Cables And Material To Serve Band., Daily To Attend Events Such As Meetings, In The Rural Area And Can Reach Up To 50Km In Compliance With The Minimum Specifications: 4 Sub-Bass Boxes Of 2,000 Rms Each, 4 Mid-Treble Boxes Of 2000 Rms Each, 1 16-Channel Sound Table, 1 Microphone Kit For Battery, 5 Wired Microphone, 2 Wireless Microphone, 8 Pair Of Leds, 1 Digital Processor, 1 Treble Amplifier 1000 Rms., Small Sound System 01 Ls9 Table, 04 Sm400 Monitors, 01 Cu O Guitar 2X12, 01 Bass Cube 4X10 + 1X15, 1 Powerplay System 8Via, 20 Pedestals, 06 Direct, 5 Mic Shure 58, 5 Mic Shure 57, 2 Mic Shure 92, 06 Mic 904, 100 2X18 1500Wts Each, Lighting 06 Moving 9R, 10 Pair Led, 04 Atomic Led Rgb, 8 Cob Led 200W, 01 Light Table, Grid Size 6X6 Q30, 2 Lines 6M., Medium-Sized Sound System 02 Table M7cl, 01 Multicable 64 Channels 100 Mts, 12 Practicable Pantograph, Side With 4 Boxes 2X18 Each Plus 6 Lines 2X10 And 2 Ti On Suspended Bamper, 08 Sm400 Monitors, 01 Sub Drum 2X18, 01 Fender Twim Guitar Cube, 01 Powerplay System 8 Ways, 01 Drums With 1 Bass Drum, 3 Tones, 2 Surm, 1 Stool, 1 Hi-Hat Machine, 2 Cymbal Stand, 01 Communication System Between Pa And Monitor, 60 Pedestals, 30 Direct, 15 Mic Shure 58, 10 Mic Shure 57, 5 Mic Shure 81, 12 Mic 904, 150 Xlr Cables, 30 P10 Cables, 6 12-Way Trays 20Mts, Pa With 18 Lines 2X10 And 2Ti, 18 Sub 2X18 1500Wts Each, 2 Front Fill 2X10 And 2 Ti, Grid Lighting With 6 Ceiling Foot Of 6Mts Q30, Plus 60 Mts Of Q50, 06 Hoists Of 10Mts Of 1Tn, 6 Aluminum Shoes, 16 Moving Beean 9R, 8 Moving Wash, 20 Pair Led, 10 Atomic Led Rgb, 6 Minibrut 6 Lamps, 01 Ma2 Table, Grid Size 8X8 Q30, 2 Lines 8M., Large Sound System 40 Linearray 2X10” + 2 Ti, 30 Sub 2X18”, 1 Slimdigital Kit, 2 Towers 8X5” + 1 Ti, 2 Sub 18” 12 Channels With 20Mts Each, 1 Drum Set With 1 Bass Drum, 1 Box, 3 Toms 10”, 12”, 14”, 2 Surdo 16”, 18” Plus 4 Cymbal Stands And 1 Complete Lead, 30 Pedestals, 250 Xlr Cables, 2 Manpower Systems, 9 Stak32, 16 Power With Individuals, 4 Active Monitors, 6 Passive Monitors 2X12” 1 Ti, 2 2X12” Valved Guitar Cubes, 1 Bass Cube 1X15” 4X10”, 1 Communication System Between Pa And Monitor, 25 Meters Of 15Tn 5-Way Cable Grommet, 2 8-Way Power Play Systems, 3 6-Way Digital Processors, 1 Battery Blower For Set Cleaning, 4 Wireless Mic, 15 Sm57 Mic, 15 Sm58 Mic, 4 Battery Mic Kit, 20 Passive Direct Box, 20 Power Strip With Power Com. Large Lighting Grid In Q50 According To The Stage Size, With Lines On Top, 6 Ceiling Feet Of 5Mt In Q30, Plus Beam At The Bottom 18Mt In Q50, 2 Ceiling Feet In Q30, Black Cloth Closure In All Grid, 3 9R Lamp Follower Cannons, Table Ma2 Toch Screen, All Art Net System With 6 Splinter, 3 Pro Power, 24 Moving 9R, 20 Movingwash, 40 Led Pair, 6 Elipsom With Iris, 12 Atomic Led Rgb, 6 Cob 300Wts Outdo
|