Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af_03/2024, Mobilization, Local Administration And Technical Monitoring Of The Work, Partial Demolition Of Asphalt Pavement, Mechanized, Without Reuse. Af_09/2023, 03/20/2026 - 08:49:41, Controlled Demolition Of Concrete With Hammer, Removal Of Concrete Pipes With A Diameter Of 0.40 M To 1.00 M In Trenches And Drains, Demolition Of Solid Brick Masonry, Manually, Loading, Maneuvering And Unloading Rubble Into Truck 10 M³ Tipper - Loading With Hydraulic Excavator (0.80 M³ Bucket / 111 Hp) And Free Unloading (Unit: M3). Af_07/2020, Removal Of Construction Debris With Bucket, Including Transportation And Disposal Of Debris, Capacity Of 7 M³, Backhoe Loader On Wheels With Loader, 4X4 Traction, Net Power. 72 Hp, Loading Bucket. Min Cap. 0.79 M3, Retro Bucket Cap. 0.18 M3, Min Operating Weight 7,140 Kg, Max Digging Depth 4.50 M - Daytime Chp. Af_06/2014, Dismantling Of Rock Blocks With Pneumatic Hammer, Dismantling Of 3Rd Category Material Cold Using Expansive Mortar In The Open Air, Removal Of 3Rd Category Material (After Excavation/Dismantling) In Trenches, With A Backhoe - Exclusive Of Loading And Transport. Af_03/2021, Transport Of 3Rd Category Material With 8 M³ Dump Truck To Rocha - Paved Highway, Rental Of Water Or Sewage Network. Af_03/2024, Mechanized Trench Excavation With Prof. Greater Than 1.5 M And Up To 3.0 M(Average Upstream And Downstream/One Composition Per Section), Excavator (0.8 M3), Width. Less Than 1.5 M, On 1St Category Soil, Locations With Low Level Of Interference. Af_09/2024, Mechanized Trench Backfilling With Backhoe Loader (Retro Bucket Capacity: 0.26 M³/Power: 88 Hp), Width 0.8 To 1, Depth 1.5 To 3.0 M, With 1St Category Soil (Without Replacement) And Percussion Soil Compactor. Af_08/2023, Preparation Of Trench Bottom With Width Less Than 1, With Layer Of Sand, Mechanized Launching. Af_08/2020, Preparation Of The Bottom Of A Trench With A Width Greater Than Or Equal To 1.5 M And Less Than 2, With A Layer Of Gravel, Manual Launching. Af_08/2020, Collection Box 1, 40X1, 50, With Concrete Bottom And Top And Masonry Walls, Concrete Tube For Rainwater Collection Networks, 400 Mm Diameter, Rigid Joint, Installed In Location With Low Level Of Interference - Supply And Installation. Af_03/2024, Mouth For Simple Tubular Manhole D = 40 Cm In Concrete, Wings With 0° Condensity, Including Formwork And Materials. Af_07/2021, Stone Mortared With Cement And Sand 1:3, 40% Mortar By Volume - Commercial Sand And Hand Stone - Supply And Laying. Af_08/2022, Regularization And Compaction Of Predominantly Clayey Soil Subgrade, For Pavement Construction Works. Af_09/2024, Construction Of Base And Sub-Base For Simple Graded Crushed Paving, 10 Cm Thick - Exclusive Of Loading And Transport. Af_09/2024, Areia Media - Deposit/Supplier Station (Picked Up At The Deposit, No Transport), Surface Regularization With Motor Grader. Af_09/2024, Manual Trench Excavation. Af_09/2024, Guide Laying (Curb) In Straight Section, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm (Length X Lower Base X Upper Base X Height). Af_01/2024, Execution Of Flooring On Int Floor
|