1) The Subject Of The Order Is A Warehouse Building, A Retaining Wall And A Shelter Along With Land Development And Accompanying Infrastructure As Part Of The Expansion Of The Existing Pszok Location. On Plot No. 491/26 In Ryglice Along With: - Internal Installation: Electrical And Gravity Ventilation, - Construction Of A Hardened Maneuvering Area With A Concrete Surface With Dispersed Reinforcement, A Concrete Pavement And A Bituminous Surface - Asphalt, - A Designed Slope, - Linear Drainage, - Land Leveling. The Ordering Party Informs That The Bill Of Quantities Should Be Treated As An Auxiliary Element. All Works That Are Not Included In The Bill Of Quantities, However, Result From The Description Of The Subject Of The Order, The Attached Design Documentation Or Stwiorb, As Well As Are Necessary To Be Performed From The Point Of View Of The Technology Of Execution And Acceptance Of The Works, Should Be Included In The Offer. The Subject Of The Order Are Works Covered By The Documentation That Is An Element Of The Swz, I.E.: Construction Design, Technical Design (Architecture And Construction), Technical Design (Power Line), Technical Design (Internal Electrical Installation), Executive Design (Architecture And Structure), Detailed Design (Power Line), Detailed Design (Internal Electrical Installation), Stwiorb, Bill Of Quantities, Designers Statement On Equivalence. Notes: Due To The Fact That The Task Is Co-Financed Under The Project Femp.02.25-Iz.00-0123/25 Entitled Supporting Waste Management In The Ryglice Commune Implemented Under The European Funds For Małopolska 2021-2027 Program. Priority 2. European Funds For The Environment, Measure 2.25. Developing The Waste Management System - Iti, Project Type A. Construction, Expansion, Reconstruction Of Selective Municipal Waste Collection Points, The Contractor Is Aware That It Is In The Ordering Partys Interest To Complete The Order On Time. In The Event Of Failure To Meet The Contractual Deadline Due To The Contractors Delay, There Is A Risk Of Losing The Funding And Resulting Damage To The Ordering Party, Which Will Be Covered By The Contractor Upon Request Within The Time Specified In The Ordering Partys Request, In The Amount Of The Lost Funding. A Similar Situation Concerns The Failure To Meet The Deadlines, Caused By The Contractors Delay, In The Implementation Of Individual Separate Stages Of The Investment Specified In The Agreed Material And Financial Schedule Of The Investment. The Co-Financing Amounts To 79.71% Of The Investment Value, But Not More Than Pln 1,240,345.03. Method Of Settlement: Stage I - Execution Of Construction Works Of The First Stage In Accordance With The Material And Financial Schedule By June 30, 2026. Payment Of Funds In The Amount Of Not Less Than Pln 597,825.00 Gross, But Not More Than Pln 750,000.00 Gross, Will Be Paid After Partial Acceptance Of The Separated First Stage Of Works, In Accordance With The Material And Financial Schedule. Stage Ii - The Deadl
|