|
Job 1- Removal Of Rubble With A Metal Bucket, Including Manual Loading And Unloading In Bota-Fora, Job 1- Cutting And Compacted Landfill, Job 1- Supply Of Earth, Including Cutting, Loading, Unloading And Transport Up To 1Km, Job 1- Transport Of Earth By Dump Truck, From 1Km, Job 1- Plywood Board Siding 6Mm, 19/03/2026 - 11:31:45, Job 1- Screen For Protection Of Works, Mesh 2 Mm, Job 1- Vb.01 - Masonry In Hollow Blocks Of Clear Concrete - 14Cm, Job 1- Neocon Standard Sanitary Partition Or Similar, Job 1- Demolition Of Masonry In General (Bricks Or Blocks), Project 1- Removal Of Partitions - Fib.Madeira Plates, With Metal Mounts, Project 1- Waterproofing Mortar With Cement, Sand And Water-Repellent, Project 1- Bd.01 - Cement And Sand Waterproofing Mortar (Reservoirs And Swimming Pools) - Mix 1:3, Thickness 30Mm, Project 1- Supply Of Metallic Structure For Roofing, Project 1- Assembly Of Metallic Structure For Roofing, Project 1- Dup Trapezoidal Tile. Galvanized Steel Thickness 0.5Mm, Coating B, H=40Mm, With Polyurethane Core E=30Mm, Job 1- 6Mm Alveolar Polycarbonate Tiles With Galvanized Metal Structure Installed, Job 1- Coverage Review, Includes Replacement Of Tiles, Flashings, Gutters, Conductors And Metallic Structure, Job 1- Pm.08 - Special/Solid Smooth Door - 92X210cm, Job 1- Special/Solid Smooth Door - 62X165 - For Sanitary Installations, Job 1- Latch And Latch Type Lock (55Mm) - Heavy Traffic, Zamac Handle, Steel Fittings, Shiny Chrome Finish - Toilet Door, Job 1- Overlapping Target, Free-Occupied Type - 60X65mm, Project 1- Ep.11 - Mosquito Screen In Galvanized Wire Mesh 14, 28 Thread Including Frame, Project 1- Revision Of Frames Including Replacement Of Glass And Painting, Project 1- Revision Of Electrical Installations, Including Replacement Of Light Fixtures, Lamps, Reactors, Wiring, Piping And Circuit Breakers, Project 1- Air Conditioning System In Specific Area, Project 1- Fire Extinguisher With Carbon Gas Charge (Co2) - 4Kg, Project 1- Fire Extinguisher With Pressurized Water Charge - 10L, Project 1- Fire Extinguisher With Dry Chemical Powder Charge - 8Kg, Project 1- Hc.02 - Concrete Channel Of A.P.P/Lid/Concrete Or Iron Grid L=40Cm, Project 1- Hc.04 - Concrete Cover For Channel Of A.P.L=0, 40M, Project 1- Siphon Toilet Basin, Made Of White Crockery, Project 1- Raised Toilet Basin For People With Disabilities Physics, Project 1- Individual White Ceramic Urinal, Basin Type - Central, Project 1- Simple Stainless Steel Basin Plate 20 - 500X400x200mm, Project 1- Top For Wet Bench - Polished Tijuca Black Granite 2Cm, Project 1- Revision Of Hydraulic Installations, Including Replacement Of Registration, Drainage Sewer And Passage Box, Job 1- Internal Plaster - Cement Mortar And Sand 1:3, Job 1- Tiles, Tie Or Plumb Joints - Set With Common Mortar, Job 1- Demolition Of Ceramic Coating Or Similar, Job 1- Repairs To Cracks And Cracks, Job 1- Type Fge Plasterboard Lining (Supply And Installation), Job 1- Demolition Of Plaster Lining, Job 1- Concrete Ballast - 150Kg Cim/M3, Job 1- Common Cemented, Straightened And Smoothed - Thickness 20Mm, Job 1- Structural Floor In Reinforced Concrete - 7Cm, Job 1- Croma Vinyl Flooring Or Similar - E=3, 2 Mm, Exclusive Base Leveling Mortar, Job 1- Anti-Slip Porcelain Floor, Job 1- Demolition Of Mortar, Ceramics Or Similar Including Leveling Mortar, Work
|