|
The Subject Of The Order Is The Design And Modernization Of The Playground By Using New Playground Equipment, Small Architecture Elements, Surfaces, Retrofitting The Existing Playground And The Design And Demolition Of A Garage Building Located In The Area Intended For Modernization Of The Playground At Ul. Małachowskiego In Rybnik, Boguszowice Stare District Based On The Functional And Utility Program. General Scope Of Works: 1. Preparation Of Design And Cost Estimate Documentation For The Modernization Of The Playground And Demolition Of The Garage Building • Development Of The Concept Of The Playground, • Preparation Of Design And Cost Estimate Documentation For The Modernization Of The Playground And Design Documentation For The Demolition Of The Garage Building Based On The Approved Concept, • Reconciliation Of The Designs With Entities Required By Law, Obtaining Arrangements And Permits Necessary To Obtain A Decision On A Building Permit/Effective Notification Of The Intention To Perform Construction Works, Demolition Permit, • Obtaining A Permit/Effective Notification Of The Intention To Perform Construction Works That Do Not Require A Building Permit For The Modernization Of A Playground, Obtaining A Permit For The Demolition Of A Garage Building With The Authorization Of The Ordering Party.2. Demolition Works, Preparatory Works • Securing The Construction Site, Fencing Off The Area In Order To Exclude The Facility From Use, • Dismantling The Existing Playground Equipment, • Demolishing The Garage Building And Transporting It To Landfills With Appropriate Authorizations.3. Assembly Works, Repair Works • Land Leveling, • Measurement Works Of Surface Earthworks, Geodetic Marking Out The Foundation Of Playground Equipment And Small Garden Architecture, • Earthworks (Drawing The Ground With Removal, Making A Ballast Layer, Aggregate Base, Making Foundation Pits, Laying Prefabricated And Poured Foundations, Backfilling The Pits With Compaction), • Making A Concrete Surface, Water-Permeable, Sandy Surface, • The Contractor Carrying Out Renovation And Necessary Repairs Of Playground Equipment Adapted To The Project, • Installation Of Playground Equipment, Elements Of Small Architecture And Additional Lamps, If Necessary, • Erecting A Fence.4. Planting Plants, Making Lawns • Planting Trees And Shrubs After Clearing The Area Of Debris, Dirt And Using Compost, • Establishing A Lawn From Seeding After Clearing The Area Of Debris And Dirt And Fertilizing The Area With Compost. 3. Inventory And Control Works • Preparation Of As-Built Documentation, Preparation Of An As-Built Geodetic Inventory Of The Constructed Facility And Submission Of Documentation To The District Geodetic Resource. • Performing A Post-Assembly Inspection. The Detailed Scope Of Work Is Specified In The Functional And Utility Program Constituting An Annex To The Swz. General Requirements Of The Ordering Party Regarding The Subject Of The Order: 1. In Order To Complete The Task,
|